flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Roofing contractors recognized for workmanship

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.


By By BD+C Staff | February 28, 2012

Winners of the 2011 Contractor Project of the Year Competition were announced by Sika Sarnafil. Winners were judged on project complexity, design uniqueness, craftsmanship, and creative problem solving.

Winners include:

  • TD Garden in Boston, Mass;
  • Grand Harbor Condominium in Destin, Fla;
  • New office complex in Warminster, Pa.; and
  • Griffin Hall, Northern Kentucky University in Highland Heights, Ky.

A winner and two finalists in four different categories: Low Slope, Steep Slope, Waterproofing and Sustainability were recognized for outstanding workmanship in completing a project using a Sika Sarnafil thermoplastic membrane for roofing or waterproofing applications.

Low Slope Category Winners
Greenwood Industries, Inc. of Millbury, Mass. won first place in the Low Slope category for the re-roofing of the TD Garden, home to the Boston Bruins and Boston Celtics. The 19,600-seat arena has a distinctive barrel roof now covered with an energy-efficient Sika Sarnafil EnergySmart Roof System. During the project Greenwood worked around a continuous schedule of TD Garden events and even withstood a hurricane to complete the project. The second place winner was All Weather Waterproofing, Inc., Salt Lake City, Utah, for the Wilkinson Student Center at Brigham Young University, Provo, Utah. Third place went to Letner Roofing Company, Inc., Orange, Calif., for the Pacific Design Center “Red” Building in West Hollywood, Calif.

Steep Slope Category Winners
In the Steep Slope category, Bel-Mac Roofing, Inc., of Santa Rosa Beach, Fla., was awarded first place for their work on Grand Harbor Condominium in Destin, Fla. High winds, numerous roof levels, and a complex geometric roof design pushed the Bel-Mac crew. The company’s creative problem solving enabled them to install a watertight Sika Sarnafil Décor Roof System that preserves the upscale look established by the condo’s failed standing seam metal roof. Peach State Roofing, Inc., Lawrenceville, Ga., was the second place finisher for the Catholic Center at the University of Georgia, Athens, GA, and Diamond Roofing Company, Inc., Syracuse, N.Y., was the third place finalist for the Finger Lakes Residential Center in Lansing, N.Y.

Waterproofing Category Winners
Tecta America Zero Company, LLC, based in Cincinnati, Ohio, took first place in the Waterproofing class for Griffin Hall, Northern Kentucky University in Highland Heights, Ky. The company battled weather conditions and an aggressive schedule for this newly constructed facility, which involved three distinct roof areas and included a vegetated green roof protected by Sika Sarnafil’s G476 waterproofing membrane. Second place in this category went to A-1 Roofing Company, Elk Grove Village, Ill., for the United Cargo Facility in Chicago, and third place to CitiRoof Corporation in Columbia, Md., for the H.D. Woodson High School in Washington, D.C.

Sustainability Category Winners
In the Sustainability category, Delta Contracting Services, Inc., of East Brunswick, N.J., was awarded first place for a new office complex in Warminster, Pa. This facility received a very high worldwide LEED score for newly constructed office buildings and garnered a LEED Platinum Certification. In second place was Morris Roofing & Sheet Metal Corporation, Springfield, Mass., for the Mass Mutual headquarters in Springfield, Mass., and in third place for this grouping was Progressive Roofing, LLC, of Phoenix, Ariz. for the Wells Fargo Arena at Arizona State University in Tempe, Ariz. BD+C

Related Stories

Building Technology | Jun 18, 2024

Could ‘smart’ building facades heat and cool buildings?

A promising research project looks at the possibilities for thermoelectric systems to thermally condition buildings, writes Mahsa Farid Mohajer, Sustainable Building Analyst with Stantec.

University Buildings | Jun 18, 2024

UC Riverside’s new School of Medicine building supports team-based learning, showcases passive design strategies

The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Created by the design-build team of CO Architects and Hensel Phelps, the medical school’s new home supports team-based student learning, offers social spaces, and provides departmental offices for faculty and staff. 

Healthcare Facilities | Jun 18, 2024

A healthcare simulation technology consultant can save time, money, and headaches

As the demand for skilled healthcare professionals continues to rise, healthcare simulation is playing an increasingly vital role in the skill development, compliance, and continuing education of the clinical workforce.

Mass Timber | Jun 17, 2024

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

Concrete Technology | Jun 17, 2024

MIT researchers are working on a way to use concrete as an electric battery

Researchers at MIT have developed a concrete mixture that can store electrical energy. The researchers say the mixture of water, cement, and carbon black could be used for building foundations and street paving.

Codes and Standards | Jun 17, 2024

Federal government releases national definition of a zero emissions building

The U.S. Department of Energy has released a new national definition of a zero emissions building. The definition is intended to provide industry guidance to support new and existing commercial and residential buildings to move towards zero emissions across the entire building sector, DOE says.

Multifamily Housing | Jun 14, 2024

AEC inspections are the key to financially viable office to residential adaptive reuse projects

About a year ago our industry was abuzz with an idea that seemed like a one-shot miracle cure for both the shockingly high rate of office vacancies and the worsening housing shortage. The seemingly simple idea of converting empty office buildings to multifamily residential seemed like an easy and elegant solution. However, in the intervening months we’ve seen only a handful of these conversions, despite near universal enthusiasm for the concept. 

Healthcare Facilities | Jun 13, 2024

Top 10 trends in the hospital facilities market

BD+C evaluated more than a dozen of the nation's most prominent hospital construction projects to identify trends that are driving hospital design and construction in the $67 billion healthcare sector. Here’s what we found.

Adaptive Reuse | Jun 13, 2024

4 ways to transform old buildings into modern assets

As cities grow, their office inventories remain largely stagnant. Yet despite changes to the market—including the impact of hybrid work—opportunities still exist. Enter: “Midlife Metamorphosis.”

Affordable Housing | Jun 12, 2024

Studio Libeskind designs 190 affordable housing apartments for seniors

In Brooklyn, New York, the recently opened Atrium at Sumner offers 132,418 sf of affordable housing for seniors. The $132 million project includes 190 apartments—132 of them available to senior households earning below or at 50% of the area median income and 57 units available to formerly homeless seniors. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021