flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

British Columbia hospital features mass timber community hall

Mass Timber

British Columbia hospital features mass timber community hall

The facility was designed with extensive input from the indigenous community.


By Peter Fabris, Contributing Editor | June 17, 2024
British Columbia's Cowichan District Hospital replacement project features mass timber community hall, Rendering courtesy Parkin Architects
Rendering courtesy Parkin Architects

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

The 607,601-sf, seven-story facility was designed with extensive input from the local indigenous community. With meaningful participation from First Nations representatives, the design process is a “first step towards rebuilding trust that has been lost over many decades of mistreatment,” according to architecture firm Parkin. Results of the collaboration include 185 rooms that can accommodate traditional burning customs conducted for healing. These rooms have independently controlled smoke systems.

“In our conversations with the indigenous community members, one of the concerns raised was that patients have experienced discrimination which has led to mistrust and prevents many from accessing health care,” says Shane Czypyha, principal, Parkin Architects. “The triage desk was redesigned in a way that moves security to a less prominent location, creating a more accepting, inclusive environment that fosters healing, while maintaining safety.”

Mass timber for healthcare environments

The two-story community hall employs mass timber throughout, with large windows to maximize sunlight. The inclusion of mass timber required strategies to alleviate concerns around using exposed timber in an acute care hospital. Areas were categorized by risk with public and non-clinical areas such as the community hall, cafeteria, staff lounges, indigenous gathering space, conference rooms, and education centers identified as appropriate candidates for the inclusion of exposed mass timber. Clinical and patient care spaces, such as inpatient bedrooms, were excluded due to the high potential for cross contamination and nosocomial infection transmission.

Selected areas were further divided into high touch vs. low touch surfaces. In high touch or high traffic areas where impact from equipment or mobility aids was likely to occur, exposed timber was either removed, protected with standard acrylic wall barriers and embedded corner guards, or elevated above floor level on durable concrete base pedestals. Proposed sealants used to finish wood structure elements needed to withstand typical hospital grade disinfectants. Timber supports were lifted off the ground to facilitate easier cleaning of flooring, reduce difficult-to-clean seams that can accumulate dirt and debris, and keep wood elements away from direct contact with mop water or floor cleaning machines that could cause premature damage and wear to wood surfaces.

Cowichan is on track to become the first CaGBC Net-Zero Carbon Hospital in Canada, and British Columbia’s first fully electric hospital. The facility will include lounge areas, a coffee bistro, cafeteria, and outdoor patio. An acknowledgement wall recognizes the traditional territory of Cowichan Tribes and welcomes people in Hul’q’umi’num and other languages. Eighty percent of rooms will be single-patient occupancy with room for loved ones. Each floor has sun rooms to connect patients who cannot venture outside with the outdoors. Construction is scheduled to be completed in 2026.

Owner: Island Health Authority
Design architect: Parkin Architects & ZGF Architects
Architect of record: Parkin Architects
MEP engineers: H.H. Angus, Bush, Bohlman & Partners , Mulvey & Banani 
Structural engineer: Bush, Bohlman & Partners
General contractor/construction manager: EllisDon

British Columbia's Cowichan District Hospital replacement project features mass timber community hall
Rendering courtesy Parkin Architects
British Columbia's Cowichan District Hospital replacement project features mass timber community hall
Rendering courtesy Parkin Architects
British Columbia's Cowichan District Hospital replacement project features mass timber community hall
Rendering courtesy Parkin Architects
British Columbia's Cowichan District Hospital replacement project features mass timber community hall
Rendering courtesy Parkin Architects

Related Stories

Healthcare Facilities | Oct 28, 2024

New surgical tower is largest addition to UNC Health campus in Chapel Hill

Construction on UNC Health’s North Carolina Surgical Hospital, the largest addition to the Chapel Hill campus since it was built in 1952, was recently completed. The seven-story, 375,000-sf structure houses 26 operating rooms, four of which are hybrid size to accommodate additional equipment and technology for newly developed procedures. 

Healthcare Facilities | Oct 18, 2024

7 design lessons for future-proofing academic medical centers

HOK’s Paul Strohm and Scott Rawlings and Indiana University Health’s Jim Mladucky share strategies for planning and designing academic medical centers that remain impactful for generations to come.

Seismic Design | Oct 17, 2024

Calif. governor signs limited extension to hospital seismic retrofit mandate

Some California hospitals will have three additional years to comply with the state’s seismic retrofit mandate, after Gov. Gavin Newsom signed a bill extending the 2030 deadline.

Healthcare Facilities | Oct 9, 2024

How healthcare operations inform design

Amanda Fisher, Communications Specialist, shares how BWBR's personalized approach and specialized experience can make a meaningful impact to healthcare facilities.

Healthcare Facilities | Oct 8, 2024

Herzog & de Meuron completes Switzerland’s largest children’s hospital

The new University Children’s Hospital Zurich features 114 rooftop patient rooms designed like wooden cottages with their own roofs. The project also includes a research and teaching facility.

Hospital Design Trends | Sep 26, 2024

Hospital benchmarking survey shows sharp rise in hospital energy costs

Grumman|Butkus Associates, a firm of energy efficiency consultants and sustainable design engineers, recently released the results of its 2023 Hospital Energy and Water Benchmarking Survey, focusing on healthcare facilities’ resource usage trends and costs for calendar years 2021 and 2022.

Healthcare Facilities | Sep 19, 2024

New El Paso VA healthcare center includes 47 departments, brain and spinal cord injury treatment services

A new 492,000 sf Veterans Administration ambulatory care facility on the William Beaumont Army Medical Center campus near El Paso, Texas will include 47 medical departments and provide brain and spinal cord injury treatment services. A design-build team of Clark Construction, SmithGroup, and HKS is spearheading the project that recently broke ground with anticipated completion in 2028.

Healthcare Facilities | Sep 9, 2024

Exploring the cutting edge of neuroscience facility design

BWBR Communications Specialist Amanda Fisher shares the unique considerations and challenges of designing neuroscience facilities.

Curtain Wall | Aug 15, 2024

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

Sponsored | Healthcare Facilities | Aug 8, 2024

U.S. healthcare building sector trends and innovations for 2024-2025

As new medicines, treatment regimens, and clinical protocols radically alter the medical world, facilities and building environments in which they take form are similarly evolving rapidly. Innovations and trends related to products, materials, assemblies, and building systems for the U.S. healthcare building sector have opened new avenues for better care delivery. Discussions with leading healthcare architecture, engineering, and construction (AEC) firms and owners-operators offer insights into some of the most promising directions. This course is worth 1.0 AIA/HSW learning unit.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021