The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.
The 607,601-sf, seven-story facility was designed with extensive input from the local indigenous community. With meaningful participation from First Nations representatives, the design process is a “first step towards rebuilding trust that has been lost over many decades of mistreatment,” according to architecture firm Parkin. Results of the collaboration include 185 rooms that can accommodate traditional burning customs conducted for healing. These rooms have independently controlled smoke systems.
“In our conversations with the indigenous community members, one of the concerns raised was that patients have experienced discrimination which has led to mistrust and prevents many from accessing health care,” says Shane Czypyha, principal, Parkin Architects. “The triage desk was redesigned in a way that moves security to a less prominent location, creating a more accepting, inclusive environment that fosters healing, while maintaining safety.”
Mass timber for healthcare environments
The two-story community hall employs mass timber throughout, with large windows to maximize sunlight. The inclusion of mass timber required strategies to alleviate concerns around using exposed timber in an acute care hospital. Areas were categorized by risk with public and non-clinical areas such as the community hall, cafeteria, staff lounges, indigenous gathering space, conference rooms, and education centers identified as appropriate candidates for the inclusion of exposed mass timber. Clinical and patient care spaces, such as inpatient bedrooms, were excluded due to the high potential for cross contamination and nosocomial infection transmission.
Selected areas were further divided into high touch vs. low touch surfaces. In high touch or high traffic areas where impact from equipment or mobility aids was likely to occur, exposed timber was either removed, protected with standard acrylic wall barriers and embedded corner guards, or elevated above floor level on durable concrete base pedestals. Proposed sealants used to finish wood structure elements needed to withstand typical hospital grade disinfectants. Timber supports were lifted off the ground to facilitate easier cleaning of flooring, reduce difficult-to-clean seams that can accumulate dirt and debris, and keep wood elements away from direct contact with mop water or floor cleaning machines that could cause premature damage and wear to wood surfaces.
Cowichan is on track to become the first CaGBC Net-Zero Carbon Hospital in Canada, and British Columbia’s first fully electric hospital. The facility will include lounge areas, a coffee bistro, cafeteria, and outdoor patio. An acknowledgement wall recognizes the traditional territory of Cowichan Tribes and welcomes people in Hul’q’umi’num and other languages. Eighty percent of rooms will be single-patient occupancy with room for loved ones. Each floor has sun rooms to connect patients who cannot venture outside with the outdoors. Construction is scheduled to be completed in 2026.
Owner: Island Health Authority
Design architect: Parkin Architects & ZGF Architects
Architect of record: Parkin Architects
MEP engineers: H.H. Angus, Bush, Bohlman & Partners , Mulvey & Banani
Structural engineer: Bush, Bohlman & Partners
General contractor/construction manager: EllisDon
Related Stories
Mass Timber | Oct 25, 2024
Mass timber achieves ‘firsts’ in three more markets
Sustainability and aesthetics continue to drive this product’s demand.
Sustainable Design and Construction | Oct 10, 2024
Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure
Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.
Mass Timber | Sep 26, 2024
5 lessons in water mitigation for mass timber projects
Sustainability leaders from Skanska, RDH, and Polygon share five tips for successful water mitigation in mass timber construction.
Mass Timber | Sep 17, 2024
Marina del Rey mixed-use development is L.A.’s largest mass timber project
An office-retail project in Marina del Rey is Los Angeles’ largest mass timber project to date. Encompassing about 3 acres, the 42XX campus consists of three low-rise buildings that seamlessly connect with exterior walkways and stairways. The development provides 151,000 sf of office space and 1,500 sf of retail space.
Airports | Aug 22, 2024
Portland opens $2 billion mass timber expansion and renovation to its international airport
This month, the Portland International Airport (PDX) main terminal expansion opened to passengers. Designed by ZGF for the Port of Portland, the 1 million-sf project doubles the capacity of PDX and enables the airport to welcome 35 million passengers per year by 2045.
Mass Timber | Jun 26, 2024
Oregon State University builds a first-of-its-kind mass timber research lab
In Corvallis, Oreg., the Jen-Hsun Huang and Lori Mills Huang Collaborative Innovation Complex at Oregon State University aims to achieve a distinction among the world’s experimental research labs: It will be the first all-mass-timber lab meeting rigorous vibration criteria (2000 micro-inches per second, or MIPS).
Mass Timber | Jun 10, 2024
5 hidden benefits of mass timber design
Mass timber is a materials and design approach that holds immense potential to transform the future of the commercial building industry, as well as our environment.
Mass Timber | May 31, 2024
Mass timber a big part of Western Washington University’s net-zero ambitions
Western Washington University, in Bellingham, Wash., 90 miles from Seattle, is in the process of expanding its ABET-accredited programs for electrical engineering, computer engineering and science, and energy science. As part of that process, the university is building Kaiser Borsari Hall, the 54,000-sf new home for those academic disciplines that will include teaching labs, research labs, classrooms, collaborative spaces, and administrative offices.
Mass Timber | May 22, 2024
3 mass timber architecture innovations
As mass timber construction evolves from the first decade of projects, we're finding an increasing variety of mass timber solutions. Here are three primary examples.
Mass Timber | May 17, 2024
Charlotte's new multifamily mid-rise will feature exposed mass timber
Construction recently kicked off for Oxbow, a multifamily community in Charlotte’s The Mill District. The $97.8 million project, consisting of 389 rental units and 14,300 sf of commercial space, sits on 4.3 acres that formerly housed four commercial buildings. The street-level retail is designed for boutiques, coffee shops, and other neighborhood services.