Rudolph and Sletten, Inc. has been recognized by the Construction Management Association of America (CMAA), San Diego Chapter for the renovation of Grossmont-Cuyamaca Community College’s Student Administrative & Griffin Student Center.
The Project Achievement Award, which recognizes outstanding achievement in construction management, is presented to Rudolph and Sletten in the category of Building Renovations Greater than $10 Million.
The 84,000-sf two facility project was completed by Rudolph and Sletten January 2012. The Griffin Student Center included a 27,000-sf renovation of the existing building as well as a 20,000-sf expansion. The new center features student meeting rooms, food stations, a health services department and a 10-foot movie screen in the lobby. The Student Administrative Building was an existing 21,000-sf wood framed structure that was expanded to 38,000-square-feet. The expansion includes enclosing the interior courtyard, breezeway areas and converting into interior space. These buildings comprise the first LEED-certified project in the Grossmont-Cuyumaca Community College District. BD+C
Related Stories
Coronavirus | Apr 21, 2020
COVID-19 update: CallisonRTKL, Patriot, PODS, and USACE collaborate on repurposed containers for ACFs
CallisonRTKL and PODS collaborate on repurposed containers for ACFs
Multifamily Housing | Apr 15, 2020
Related Group picks Stantec to design and engineer Manor Miramar residences in Florida
Related Group picks Stantec to design and engineer Manor Miramar residences in Florida.
Coronavirus | Apr 4, 2020
COVID-19: Architecture firms churn out protective face shields using their 3D printers
Architecture firms from coast to coast have suddenly turned into manufacturing centers for the production of protective face shields and face masks for use by healthcare workers fighting the COVID-10 pandemic.
Coronavirus | Mar 30, 2020
Learning from covid-19: Campuses are poised to help students be happier
Overcoming isolation isn’t just about the technological face to face, it is about finding meaningful connection and “togetherness”.
Coronavirus | Mar 15, 2020
Designing office building lobbies to respond to the coronavirus
Touch-free design solutions and air purifiers can enhance workplace wellness.
Architects | Mar 11, 2020
S/L/A/M/ Collaborative grows significantly in deal with CBRE
The architectural firm acquires five of Heery’s practices and adds 70 people.
University Buildings | Mar 9, 2020
Designing campus buildings through an equity lens
As colleges become more diverse, campus conversation is focusing on how to create equitable environments that welcome all voices.
Architects | Mar 9, 2020
New York's façade inspection program gets an overhaul following a death from falling terra cotta
January 14, 2020, kicked off big changes to the NYC Local Law 11 Façade Inspection and Safety Program (FISP) for Cycle 9.
Healthcare Facilities | Mar 9, 2020
Mobile wayfinding platform helps patients, visitors navigate convoluted health campuses
Gozio Health uses a robot to roam hospital campuses to capture data and create detailed maps of the building spaces and campus.
AEC Innovators | Mar 5, 2020
These 17 women are changing the face of construction
During this Women in Construction Week, we shine a spotlight on 17 female leaders in design, construction, and real estate to spur an important conversation of diversity, inclusion, and empowerment.