flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Schmidt Hammer Lassen Architects will develop mixed-use project on former site of Carlsberg Brewery

Mixed-Use

Schmidt Hammer Lassen Architects will develop mixed-use project on former site of Carlsberg Brewery

The 36,000-sm project will cover a city block and include a residential tower.


By David Malone, Associate Editor | May 24, 2017

After closing its doors in 2008, the industrial site of the former Carlsberg Brewery production plant in Copenhagen, Denmark has re-emerged as a sustainable city district. It is home to urban spaces, public transport, and new buildings that complement the existing historical architecture.

Now, the newest planned development for the district has officially selected its architect. Schmidt Hammer Lassen Architects (along with Holscher Nordberg Architects) will develop a 387,500-sf project that consists of one city block and a 262-foot-tall residential building. The development will sit near the famous Elephant gates in the northwestern corner of the site and provide 17,000 sm of housing, 7,000 sm of offices, 2,000 sm of retail, cafes, and restaurants, and 10,000 sm of basement space. The new residential tower will form a link between the two main public squares in the Carlsberg city district.

“The location, with historic neighbors and a sloping terrain, creates an exciting and technical challenge. At the same time, the tower will rise above Carlsberg City and become part of Copenhagen's new skyline, thus becoming a reference point that both historically and physically will help tie the city together," says Senior Partner at Schmidt Hammer Lassen, Kristian Ahlmark.

The entire Carlsberg City district is expected to be completed in 2024. The development will offer over 3,000 new homes. 10,000 students have already begun their first semester at the new UCC Campus Carlsberg.  Transportation options will include a large network of bicycle paths and a new modern commuter railway station.

Related Stories

Mixed-Use | Jun 2, 2021

World’s tallest detached-core building completes in Shenzhen

Morphosis designed the project.

Mixed-Use | May 24, 2021

33-story glass mixed-use tower to rise in downtown Orlando

DLR Group is designing the project.

Mixed-Use | May 24, 2021

Olson Kundig unveils new mixed-use high-rise in Atlanta

The project is currently under construction along Atlanta’s BeltLine.

Mixed-Use | May 7, 2021

Mixed-use development tops out in Brooklyn’s Brownsville neighborhood

The project will bring 160 affordable housing units to the area.

Mixed-Use | Apr 28, 2021

The Dime is Williamsburg’s newest mixed-use development

Fogarty Finger designed the project.

Mixed-Use | Apr 22, 2021

Jakarta’s first supertall tower tops out

The project will anchor the Thamrin Nine development.

Mixed-Use | Apr 20, 2021

EskewDumezRipple and Wolf Ackerman unveil the Center for Developing Entrepreneurs

The Charlottesville, Va. project is slated for completion later this year.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021