After closing its doors in 2008, the industrial site of the former Carlsberg Brewery production plant in Copenhagen, Denmark has re-emerged as a sustainable city district. It is home to urban spaces, public transport, and new buildings that complement the existing historical architecture.
Now, the newest planned development for the district has officially selected its architect. Schmidt Hammer Lassen Architects (along with Holscher Nordberg Architects) will develop a 387,500-sf project that consists of one city block and a 262-foot-tall residential building. The development will sit near the famous Elephant gates in the northwestern corner of the site and provide 17,000 sm of housing, 7,000 sm of offices, 2,000 sm of retail, cafes, and restaurants, and 10,000 sm of basement space. The new residential tower will form a link between the two main public squares in the Carlsberg city district.
“The location, with historic neighbors and a sloping terrain, creates an exciting and technical challenge. At the same time, the tower will rise above Carlsberg City and become part of Copenhagen's new skyline, thus becoming a reference point that both historically and physically will help tie the city together," says Senior Partner at Schmidt Hammer Lassen, Kristian Ahlmark.
The entire Carlsberg City district is expected to be completed in 2024. The development will offer over 3,000 new homes. 10,000 students have already begun their first semester at the new UCC Campus Carlsberg. Transportation options will include a large network of bicycle paths and a new modern commuter railway station.
Related Stories
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 23, 2012
Summit Design+Build selected as GC for Chicago restaurant
Little Goat will truly be a multifunctional space. Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.
| Apr 20, 2012
Shawmut completes Yard House Restaurant in Boston
12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.
| Apr 6, 2012
Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning
The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.
| Apr 4, 2012
JCJ Architecture designs New York City's first casino
Aqueduct Racetrack complex transformed into modern entertainment destination.
| Apr 3, 2012
Luxury hotel 'groundscraper' planned in abandoned quarry
Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.