flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Seattle’s high-rise convention center nears completion

High-rise Construction

Seattle’s high-rise convention center nears completion

The 1.5-million-square-foot addition includes two mixed-use office and residential towers.
 


By Novid Parsi, Contributing Editor | April 14, 2022
Washington State Convention Center ext
The new Washington State Convention Center Summit Building is on track to complete most of its construction later this year. Courtesy Adam Hunter/LMN Architects.

The new Washington State Convention Center Summit Building—billed as the first high-rise convention center in North America—is on track to complete most of its construction later this year.

Designed by LMN Architects, the 1.5-million-square-foot addition to the Seattle Convention Center occupies four city blocks in the heart of the city’s business and entertainment district. Located among several of Seattle’s densest neighborhoods, the project intends to serve as a connecting hub, with a southeast corner that cantilevers over the adjacent highway.
 
The building’s vertical organization, along with numerous flexible event spaces that include a 100,000-square-foot hall, aims to provide efficiency and flexibility for a variety of uses, from single large shows to concurrent visitor and community events. 

WSCC Summit interior
The building’s vertical organization, along with numerous flexible event spaces that include a 100,000-square-foot hall, aims to provide efficiency and flexibility for a variety of uses. Courtesy Adam Hunter/LMN Architects.

Mixed-Use Towers

The project also includes two mixed-use towers: a 540,000-square-foot office tower and an approximately 400-unit residential tower. The development offers 36,000 square feet of retail space as well as 16,000 square feet of public open space.
 

The interior spaces feature a 200-foot-tall atrium, as well as an array of sustainable, local, and regional materials. Salvaged wood—some from an old building demolished on site and other wood salvaged from log booms—is featured throughout the building. Local artists from diverse communities are creating over 20 art pieces and installations for the project.
 

The Summit Building’s community benefits package includes affordable housing, public art, public open space, and infrastructure improvements for pedestrian, bicycle, and transit. The convention center is “more like urban infrastructure than a single building,” according to a statement from LMN Architects. “The project elevates the quality of the urban experience with welcoming community places and experiences, both formal and informal, creating a focus of civic life and identity.”
 
Owner and developer: Seattle Convention Center
Design architect and architect of record: LMN Architects
MEP engineer: Arup in association with McCleskey Consulting, SN Consulting, and FSi Consulting
Structural engineer: Magnusson Klemencic Associates in association with Carla Keel Group and Lund Opsahl
General contractor/construction manager: Clark/Lewis

WSCC Interior 2
Courtesy Adam Hunter/LMN Architects.
WSCC ext 2
Courtesy Adam Hunter/LMN Architects.

 

Related Stories

Building Team | Jul 30, 2018

Construction tech is the new investment darling for VC funds

In the first half of 2018, venture capital firms invested $1.05 billion in global construction tech startups, setting a record high.

Building Team | Jun 22, 2018

What owners should know before choosing the design-build project delivery method

Outside of drawing up a well-written contract, owners often overlook a key attribute that can significantly impact the success of a design-build project, writes Skanska’s Julie Hyson.

Building Team | Jun 13, 2018

How your AEC firm's brand affects recruiting top talent

There is a major shift in workforce demographics as upwards of 80 million baby boomers retire over the next fifteen years.

Sponsored | Building Team | May 8, 2018

5 tips to improve employee utilization (and morale)

Ways to increase productivity and revenue, while providing a supportive workplace environment

Architects | Apr 5, 2018

Tech Report 5.0: The Human Touch

Can studying humans at a behavioral level produce better buildings? Cognitive architecture experts are working to find out.

Sponsored | Building Team | Mar 28, 2018

6 strategies to keep your project on budget

Here are six strategies to keep your projects on or even under budget.

Sponsored | | Mar 14, 2018

Getting there may be costing you more

Commercial transportation is getting more expensive, and it’s driving up the price of steel.  

Sponsored | Building Team | Dec 12, 2017

3 tips to address the top causes of budget overruns

The most cited issues are communication breakdowns, inadequate fees for the work provided, and unrealistic deadlines or schedules.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021