This exemplary project reminds us that our buildings can be both sustainable and beautiful, comfortable and efficient,” said Building Team Awards judge Bill Kline, AIA, EDAC, LEED AP, Vice President and Healthcare Studio Leader at SmithGroupJJR.
The 14,000-sf Alnoba leadership training center is the first project in New England to meet the quality and building performance standards prescribed by the Passive House energy model. A highly insulated shell—12 to 14 inches thick, incorporating triple-pane thermally insulated windows from Germany—wraps the entire building to achieve solar heat recovery. Five radiant-floor heating zones within the slabs cover 75% of the public spaces.
The Building Team went to great lengths to meet the stringent performance standards while realizing the owner’s design vision. This includes timber frames that were built using historic hand tools and traditional methods to ensure authenticity, beauty, and strength.
Reclaimed and recreated timber frames and triple-pane thermally insulated windows highlight the groundbreaking Passive House design of the Alnoba leadership development center. Trent Bell Photography.
Building Team – Submitting firm, general contractor Callahan Construction Managers Owner Kensington Investment Company Architect GO Logic Structural engineer Becker Structural Engineers Mechanical Petersen Engineering Electrical Engineered Building Systems Plumbing engineer Granite State Plumbing and Heating
General Information – Size 14,000 sf Cost $10.4 million Construction time November 2014 to August 2016 Delivery method GMP
Trent Bell Photography.
Related Stories
Building Team Awards | Jun 14, 2017
17 projects earn BD+C's 2017 Building Team Awards
Of the 17 projects, one received a Platinum Award, six received Gold Awards, six received Silver Awards, two received Bronze Awards, and two received Honorable Mentions.
Building Team Awards | Jun 14, 2017
3D-printed office: Office of the Future
Dubai kicks off 3D-printing tech initiative with a novel office project.
Building Team Awards | Jun 14, 2017
A space for all: Lighthouse for the Blind and Visually Impaired
Nonprofit HQ fitout improves functionality, accessibility for blind and low-vision individuals.
Building Team Awards | Jun 13, 2017
Government campus reimagined: Intelligence Community Campus
Building Team converts 1940s campus into a sleek, modern home for U.S. intelligence agencies.
Building Team Awards | Jun 12, 2017
Circles and squares: Faena Arts Center
Silver Award: The Faena Arts Center’s forum is divided into two volumes, one a cylinder, the other a cube.
Building Team Awards | Jun 12, 2017
The right prescription: University of North Dakota School of Medicine & Health Sciences
Silver Award: North Dakota builds a new medical/health sciences school to train and retain more physicians.
Building Team Awards | Jun 12, 2017
Texas technopark: TechnipFMC John T. Gremp Campus
Silver Award: TechnipFMC’s new campus marks the start of a massive planned community in north Houston.
Building Team Awards | Jun 8, 2017
Quick turnaround: Partners HealthCare
Silver Award: A 2½-year project brings Partners HealthCare’s sprawling administrative functions under one roof.
Building Team Awards | Jun 8, 2017
Raising the bar: Zurich North American Headquarters
Silver Award: Forgoing a typical center-core design, the Zurich North America Headquarters rises 11 stories across three stacked bars.
Building Team Awards | Jun 8, 2017
Team win: Clemson University Allen N. Reeves Football Operations Complex
Silver Award: Clemson gets a new football operations palace, thanks to its building partners’ ability to improvise.