flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

See who's attending BD+C's Under 40 Leadership Summit in SF

See who's attending BD+C's Under 40 Leadership Summit in SF

The list of AEC firms participating in our 3rd Annual Under 40 Leadership Summit continues to grow.


By BD+C Staff | September 24, 2013

There's still time to register for our 3rd Annual Under 40 Leadership Summit, October 9-11 in San Francisco.

The list of AEC firms participating in this year's event continues to grow. The following companies are sending at least one of their rising stars to the Summit (many are sending multiple people): 

 

 

Autodesk
Balfour Beatty
CTA Inc.
Esken + Dumez + Ripple
Gensler
HDR
Hill International
HMC Architects
hnedak bobo group
Jacobs Global Buildings
JE Dunn
KLMK Group
Level 10 Construction
Manhattan Construction
Martin/Martin
NTD
PHX Architecture
SmithGroupJJR
Southland Industries
SSOE Group
Stantec
Swinerton
Teabuild
Walter P Moore

If you know of up-and-coming leaders at your firm, please pass the U40 Leadership Summit registration link on: http://www.bdcnetwork.com/Under40Summit/index.html. 

Attendees can earn up to 10.5 AIA CES Learning Units and participate in exclusive tours of Autodesk Gallery and the Mission Bay/UCSF Science & Technology-Healthcare-Mixed Use District.

PLUS, the Summit’s Vision U40 Competition, to be facilitated by Autodesk Fellow Tom Wujec (see his video at www.BDCnetwork.com/under40summit), will group Summiteers into teams to develop advanced concepts to solve major societal and global problems in eight categories: Access + Mobility, Aesthetics + Beauty, Climate Change + Environment, Food Equity, Human Health + Performance, Human Spirit + Quality of Life, Social Justice, and Technological Innovation. The winning team will share the $3,000 Vision U40 Prize and four runner-up teams will each share $500.

For the special rate of $195, register by September 27 (using code U40SF) at www.BDCnetwork.com/under40summit.

Related Stories

Warehouses | Oct 19, 2023

JLL report outlines 'tremendous potential' for multi-story warehouses

A new category of buildings, multi-story warehouses, is beginning to take hold in the U.S. and their potential is strong. A handful of such facilities, also called “urban logistics buildings” have been built over the past five years, notes a new report by JLL.

Building Materials | Oct 19, 2023

New white papers offer best choices in drywall, flooring, and insulation for embodied carbon and health impacts

“Embodied Carbon and Material Health in Insulation” and “Embodied Carbon and Material Health in Gypsum Drywall and Flooring,” by architecture and design firm Perkins&Will in partnership with the Healthy Building Network, advise on how to select the best low-carbon products with the least impact on human health.

Contractors | Oct 19, 2023

Crane Index indicates slowing private-sector construction

Private-sector construction in major North American cities is slowing, according to the latest RLB Crane Index. The number of tower cranes in use declined 10% since the first quarter of 2023. The index, compiled by consulting firm Rider Levett Bucknall (RLB), found that only two of 14 cities—Boston and Toronto—saw increased crane counts.

Office Buildings | Oct 19, 2023

Proportion of workforce based at home drops to lowest level since pandemic began

The proportion of the U.S. workforce working remotely has dropped considerably since the start of the Covid 19 pandemic, but office vacancy rates continue to rise. Fewer than 26% of households have someone who worked remotely at least one day a week, down sharply from 39% in early 2021, according to the latest Census Bureau Household Pulse Surveys. 

Products and Materials | Oct 10, 2023

‘Works with WELL’ product licensing program launched by International WELL Building Institute

The International WELL Building Institute (IWBI) recently launched the Works with WELL product licensing program. Works with Well certification allows manufacturers to demonstrate that their products align with WELL strategies. 

Mass Timber | Oct 10, 2023

New York City launches Mass Timber Studio to spur more wood construction

New York City Economic Development Corporation (NYCEDC) recently launched New York City Mass Timber Studio, “a technical assistance program to support active mass timber development projects in the early phases of project planning and design.”

Government Buildings | Oct 10, 2023

GSA names Elliot Doomes Public Buildings Service Commissioner

The U.S. General Services Administration (GSA) announced that the agency’s Public Buildings Service Commissioner Nina Albert will depart on Oct. 13 and that Elliot Doomes will succeed her.

Higher Education | Oct 10, 2023

Tracking the carbon footprint of higher education campuses in the era of online learning

With more effective use of their facilities, streamlining of administration, and thoughtful adoption of high-quality online learning, colleges and universities can raise enrollment by at least 30%, reducing their carbon footprint per student by 11% and lowering their cost per student by 15% with the same level of instruction and better student support.

MFPRO+ News | Oct 6, 2023

Announcing MultifamilyPro+

BD+C has served the multifamily design and construction sector for more than 60 years, and now we're introducing a central hub within BDCnetwork.com for all things multifamily.

Regulations | Oct 4, 2023

New York adopts emissions limits on concrete

New York State recently adopted emissions limits on concrete used for state-funded public building and transportation projects. It is the first state initiative in the U.S. to enact concrete emissions limits on projects undertaken by all agencies, according to a press release from the governor’s office.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021