flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

See who's attending BD+C's Under 40 Leadership Summit in SF

See who's attending BD+C's Under 40 Leadership Summit in SF

The list of AEC firms participating in our 3rd Annual Under 40 Leadership Summit continues to grow.


By BD+C Staff | September 24, 2013

There's still time to register for our 3rd Annual Under 40 Leadership Summit, October 9-11 in San Francisco.

The list of AEC firms participating in this year's event continues to grow. The following companies are sending at least one of their rising stars to the Summit (many are sending multiple people): 

 

 

Autodesk
Balfour Beatty
CTA Inc.
Esken + Dumez + Ripple
Gensler
HDR
Hill International
HMC Architects
hnedak bobo group
Jacobs Global Buildings
JE Dunn
KLMK Group
Level 10 Construction
Manhattan Construction
Martin/Martin
NTD
PHX Architecture
SmithGroupJJR
Southland Industries
SSOE Group
Stantec
Swinerton
Teabuild
Walter P Moore

If you know of up-and-coming leaders at your firm, please pass the U40 Leadership Summit registration link on: http://www.bdcnetwork.com/Under40Summit/index.html. 

Attendees can earn up to 10.5 AIA CES Learning Units and participate in exclusive tours of Autodesk Gallery and the Mission Bay/UCSF Science & Technology-Healthcare-Mixed Use District.

PLUS, the Summit’s Vision U40 Competition, to be facilitated by Autodesk Fellow Tom Wujec (see his video at www.BDCnetwork.com/under40summit), will group Summiteers into teams to develop advanced concepts to solve major societal and global problems in eight categories: Access + Mobility, Aesthetics + Beauty, Climate Change + Environment, Food Equity, Human Health + Performance, Human Spirit + Quality of Life, Social Justice, and Technological Innovation. The winning team will share the $3,000 Vision U40 Prize and four runner-up teams will each share $500.

For the special rate of $195, register by September 27 (using code U40SF) at www.BDCnetwork.com/under40summit.

Related Stories

Luxury Residential | Oct 2, 2023

Chicago's Belden-Stratford luxury apartments gets centennial facelift

The Belden-Stratford has reopened its doors following a renovation that blends the 100-year-old building’s original architecture with modern residences.

Market Data | Oct 2, 2023

Nonresidential construction spending rises 0.4% in August 2023, led by manufacturing and public works sectors

National nonresidential construction spending increased 0.4% in August, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau. On a seasonally adjusted annualized basis, nonresidential spending totaled $1.09 trillion.

Construction Costs | Sep 28, 2023

U.S. construction market moves toward building material price stabilization

The newly released Quarterly Construction Cost Insights Report for Q3 2023 from Gordian reveals material costs remain high compared to prior years, but there is a move towards price stabilization for building and construction materials after years of significant fluctuations. In this report, top industry experts from Gordian, as well as from Gilbane, McCarthy Building Companies, and DPR Construction weigh in on the overall trends seen for construction material costs, and offer innovative solutions to navigate this terrain.

Resiliency | Sep 25, 2023

National Institute of Building Sciences, Fannie Mae release roadmap for resilience

The National Institute of Building Sciences and Fannie Mae have released the Resilience Incentivization Roadmap 2.0. The document is intended to guide mitigation investment to prepare for and respond to natural disasters.

Codes and Standards | Sep 25, 2023

Lendlease launches new protocol for Scope 3 carbon reduction

Lendlease unveiled a new protocol to monitor, measure, and disclose Scope 3 carbon emissions and called on built environment industry leaders to tackle this challenge.

Data Centers | Sep 21, 2023

North American data center construction rises 25% to record high in first half of 2023, driven by growth of artificial intelligence

CBRE’s latest North American Data Center Trends Report found there is 2,287.6 megawatts (MW) of data center supply currently under construction in primary markets, reaching a new all-time high with more than 70% already preleased. 

Adaptive Reuse | Sep 15, 2023

Salt Lake City’s Frank E. Moss U.S. Courthouse will transform into a modern workplace for federal agencies

In downtown Salt Lake City, the Frank E. Moss U.S. Courthouse is being transformed into a modern workplace for about a dozen federal agencies. By providing offices for agencies previously housed elsewhere, the adaptive reuse project is expected to realize an annual savings for the federal government of up to $6 million in lease costs.

Data Centers | Sep 15, 2023

Power constraints are restricting data center market growth

There is record global demand for new data centers, but availability of power is hampering market growth. That’s one of the key findings from a new CBRE report: Global Data Center Trends 2023.

Engineers | Sep 15, 2023

NIST investigation of Champlain Towers South collapse indicates no sinkhole

Investigators from the National Institute of Standards and Technology (NIST) say they have found no evidence of underground voids on the site of the Champlain Towers South collapse, according to a new NIST report. The team of investigators have studied the site’s subsurface conditions to determine if sinkholes or excessive settling of the pile foundations might have caused the collapse. 

Office Buildings | Sep 14, 2023

New York office revamp by Kohn Pedersen Fox features new façade raising occupant comfort, reducing energy use

The modernization of a mid-century Midtown Manhattan office tower features a new façade intended to improve occupant comfort and reduce energy consumption. The building, at 666 Fifth Avenue, was originally designed by Carson & Lundin. First opened in November 1957 when it was considered cutting-edge, the original façade of the 500-foot-tall modernist skyscraper was highly inefficient by today’s energy efficiency standards.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021