flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Seismic Design Working Group calls for participation in peer review process

High-rise Construction

Seismic Design Working Group calls for participation in peer review process

Research at an advanced stage.


By Peter Fabris, Contributing Editor | March 9, 2016
Seismic Design Working Group calls for participation in peer review process

Seattle. Photo: sama093/Creative Commons.

The Council on Tall Buildings and Urban Habitat Seismic Working Group is seeking individuals to participate in its peer review process.

The group wants professionals to review its findings and make important contributions to the final output. In 2008, the CTBUH Seismic Working Group produced a publication “Recommendations for the Seismic Design of High-rise Buildings.” In this document and in subsequent working group meetings, it was established that Performance Based Seismic Design is most appropriate for tall building design, particularly in regions of high seismicity. 

Subsequently, the CTBUH Performance Based Seismic Design Working Group was formed to publish the “Performance Based Seismic Design (PBSD) of Tall Buildings” Technical Guide. Where international standard practice varies, the publication will highlight and contrast design conventions. 

This document will also investigate whether historically established design practices should be modified in light of the substantial increase in our ability to analyze the behavior of tall buildings through the PBSD process. For more information on the Performance Based Seismic Design Working Group, contact workinggroups@ctbuh.org.

Related Stories

| Feb 13, 2013

'Vegetative tower' apartments to revive NYC site

A Manhattan site formerly slated for development with a "tower of cubes"—a now-defunct project by Santiago Calatrava—will be revived with a 998-foot, 300,000-sf apartment building by Morali Architects.

| Jul 9, 2012

Modular Construction Delivers Model for New York Housing in Record Time

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.

| Jul 2, 2012

San Francisco lays claim to the greenest building in North America

The 13-floor building can hold around 900 people, but consumes 60% less water and 32% less energy than most buildings of its kind.

| Jun 13, 2012

Thornton Tomasetti founding principals receive CTBUH Fazlur R. Khan Lifetime Achievement Medal

This is the first time the CTBUH Board of Trustees has awarded the prize to two individuals jointly.

| Jun 6, 2012

KPF designs tower for Yongsan IBD

The master plan, created by Studio Daniel Libeskind, is a dynamic urban environment containing contributions from 19 different architects practicing in diverse locations around the globe.

| Jun 6, 2012

SOM urges Chicago tenants to partner with landlords to cut energy use

Tenants can exceed building energy challenge targets recently announced by Mayor Emanuel.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021