flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Seismic Design Working Group calls for participation in peer review process

High-rise Construction

Seismic Design Working Group calls for participation in peer review process

Research at an advanced stage.


By Peter Fabris, Contributing Editor | March 9, 2016
Seismic Design Working Group calls for participation in peer review process

Seattle. Photo: sama093/Creative Commons.

The Council on Tall Buildings and Urban Habitat Seismic Working Group is seeking individuals to participate in its peer review process.

The group wants professionals to review its findings and make important contributions to the final output. In 2008, the CTBUH Seismic Working Group produced a publication “Recommendations for the Seismic Design of High-rise Buildings.” In this document and in subsequent working group meetings, it was established that Performance Based Seismic Design is most appropriate for tall building design, particularly in regions of high seismicity. 

Subsequently, the CTBUH Performance Based Seismic Design Working Group was formed to publish the “Performance Based Seismic Design (PBSD) of Tall Buildings” Technical Guide. Where international standard practice varies, the publication will highlight and contrast design conventions. 

This document will also investigate whether historically established design practices should be modified in light of the substantial increase in our ability to analyze the behavior of tall buildings through the PBSD process. For more information on the Performance Based Seismic Design Working Group, contact workinggroups@ctbuh.org.

Related Stories

High-rise Construction | Sep 18, 2019

Central Park Tower tops out in New York City

The building will be the tallest residential skyscraper in the world.

AEC Innovators | Aug 27, 2019

7 AEC industry disruptors and their groundbreaking achievements

From building prefab factories in the sky to incubating the next generation of AEC tech startups, our 2019 class of AEC Innovators demonstrates that the industry is poised for a shakeup. Meet BD+C’s 2019 AEC Innovators.

Museums | Jul 29, 2019

A new museum debuts inside the Empire State Building

A $165 million, 10,000-sf museum opened on the second floor of the Empire State Building in New York City, completing the second of a four-phase “reimagining” of that building’s observatory experience, which draws four million visitors annually.

High-rise Construction | Jul 25, 2019

Could this 500 foot, Bjarke Ingels-designed observation tower rise in San Diego?

The tower would be part of the $2.4 billion Seaport San Diego project.

Building Tech | Jun 26, 2019

Modular construction can deliver projects 50% faster

Modular construction can deliver projects 20% to 50% faster than traditional methods and drastically reshape how buildings are delivered, according to a new report from McKinsey & Co.

High-rise Construction | Apr 11, 2019

Top new skyscrapers for 2019: Salesforce Tower named best worldwide

The San Francisco tower was recognized for its innovations in seismic engineering and a design that "gives back" to the community. 

High-rise Construction | Apr 10, 2019

*Updated* A Tulip is ready to bloom in London

Designed by Foster + Partners, the Tulip will rise 1,001 feet and be a new cultural and tourist attraction.

High-rise Construction | Mar 4, 2019

Goettsch Partners' tallest tower ever tops out in China

The tower will become the tallest in Nanning, China upon completion.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021