Four billion pounds of fresh produce flow through the Mariposa Land Port of Entry, Nogales, Ariz., from Mexico every year. More than 300,000 trucks, nearly three million cars, and more than three million people enter the U.S. via this import-export gateway, which accounts for $30–35 billion a year in commerce.
The new $187 million port, designed by Jones Studio, Phoenix, for the U.S. General Services Administration, has more than doubled the capacity of the facility it replaced. The 55-acre site now has 14 processing lanes for cars, buses, and RVs; the old port had four. According to Paul Andrade, AIA, Project Executive for GSA Design & Construction Region 9, the 216,000-sf facility “will likely serve as a template for future port designs.”
The Building Team not only kept the port fully operational during nearly four years of construction, it shifted commercial processing facilities into earlier phases of the project; this enabled the primary tenant, Customs and Border Protection (CBP), to double commercial capacity three years ahead of project completion. The team further improved CBP’s efficiency by segregating the general public from commercial inspection operations.
PROJECT SUMMARY
SILVER AWARD
Mariposa Land Port of Entry
Nogales, Ariz.BUILDING TEAM
Submitting firm: Jones Studio, Inc. (architect)
Owner: U.S. General Services Administration
Structural: Bakkum Noelke Consulting Structural Engineers
Mechanical/plumbing: Associated Mechanical Engineers, PLLC
Electrical: Woodward Engineering, Inc.
GC: Hensel Phelps Construction Co.
CM: Heery InternationalGENERAL INFORMATION
Project size: 216,000 gsf
Construction cost: $187 million ($173.7 million from ARRA funds)
Construction period: October 2010 to August 2014
Delivery method: Design-bid-build
To speed up the construction schedule, the Building Team came up with a new way to pour slabs up against concrete tilt-up panels. The traditional way usually requires two pours; the team found a way to do it in one step.
The team redesigned the truck dock to increase capacity. In the old port, three dock spaces were needed to offload and reload a full semi-trailer. The team designed a deeper dock to allow for the entire contents of the trailer to be unloaded directly behind the vehicle.
In the midst of production, Homeland Security mandated a pilot program for traffic returning to Mexico. The team went into design-build mode and produced $10 million worth of work in less than a year to keep the original contract scope on schedule.
Other hallmarks of the project:
• 97% diversion of construction waste from landfill by contractor Hensel Phelps.
• 58% of subcontracts awarded to small business enterprises.
• 32% participation by women-owned businesses, vs. a baseline goal of 5%.
• LEED-NC (2.2) Gold. A million-gallon tank stores enough rainwater from the short rainy season to irrigate the landscape throughout the dry season.
The Mariposa POE now represents “the showcase design for southern border ports of entry,” says Tom Yearout, retired Deputy Director of CBP’s Tucson Field Office.
Vehicles await entry to the U.S. A Building Team led by designer Jones Studio and GC Hensel Phelps worked with Customs and Border Protection on an improved trench design that will provide easy access to service, modify, and replace high-tech scanning and processing equipment. The design has been recognized as a CBP Best Practice.
Related Stories
Adaptive Reuse | Sep 12, 2024
White paper on office-to-residential conversions released by IAPMO
IAPMO has published a new white paper titled “Adaptive Reuse: Converting Offices to Multi-Residential Family,” a comprehensive analysis of addressing housing shortages through the conversion of office spaces into residential units.
Mixed-Use | Sep 10, 2024
Centennial Yards, a $5 billion mixed-use development in downtown Atlanta, tops out its first residential tower
Centennial Yards Company has topped out The Mitchell, the first residential tower of Centennial Yards, a $5 billion mixed-use development in downtown Atlanta. Construction of the apartment building is expected to be complete by the middle of next year, with first move-ins slated for summer 2025.
Healthcare Facilities | Sep 9, 2024
Exploring the cutting edge of neuroscience facility design
BWBR Communications Specialist Amanda Fisher shares the unique considerations and challenges of designing neuroscience facilities.
Office Buildings | Sep 6, 2024
Fact sheet outlines benefits, challenges of thermal energy storage for commercial buildings
A U.S. Dept. of Energy document discusses the benefits and challenges of thermal energy storage for commercial buildings. The document explains how the various types of thermal energy storage technologies work, where their installation is most beneficial, and some practical considerations around installations.
Office Buildings | Sep 5, 2024
Office space downsizing trend appears to be past peak
The office downsizing trend may be past its peak, according to a CBRE survey of 225 companies with offices in the U.S., Canada, and Latin America. Just 37% of companies plan to shrink their office space this year compared to 57% last year, the survey found.
University Buildings | Sep 4, 2024
UC San Diego’s new Multidisciplinary Life Sciences Building will support research and teaching in both health and biological sciences
The University of California San Diego has approved plans for a new Multidisciplinary Life Sciences Building, with construction starting this fall. The 200,000-sf, six-level facility will be the first building on the UC San Diego campus to bridge health science research with biological science research and teaching.
Codes and Standards | Sep 3, 2024
Atlanta aims to crack down on blighted properties with new tax
A new Atlanta law is intended to crack down on absentee landlords including commercial property owners and clean up neglected properties. The “Blight Tax” allows city officials to put levies on blighted property owners up to 25 times higher than current millage rates.
Resiliency | Sep 3, 2024
Phius introduces retrofit standard for more resilient buildings
Phius recently released, REVIVE 2024, a retrofit standard for more resilient buildings. The standard focuses on resilience against grid outages by ensuring structures remain habitable for at least a week during extreme weather events.
Construction Costs | Sep 2, 2024
Construction material decreases level out, but some increases are expected to continue for the balance Q3 2024
The Q3 2024 Quarterly Construction Insights Report from Gordian examines the numerous variables that influence material pricing, including geography, global events and commodity volatility. Gordian and subject matter experts examine fluctuations in costs, their likely causes, and offer predictions about where pricing is likely to go from here. Here is a sampling of the report’s contents.
Adaptive Reuse | Aug 29, 2024
More than 1.2 billion sf of office space have strong potential for residential conversion
More than 1.2 billion sf of U.S. office space—14.8% of the nation’s total—have strong potential for conversion to residential use, according to real estate software and services firm Yardi. Yardi’s new Conversion Feasibility Index scores office buildings on their suitability for multifamily conversion.