The more indecisive among us will be able to relate to the back and forth dance Silverstein Properties is currently doing as it tries to make a decision about what to build on a large property in Manhattan’s Far West Side.
Before purchasing a Mercedes-Benz dealership on the site for $115 million and demolishing it back in 2015, Silverstein announced its plans to build two 60-story-plus towers with a total of around 1,000 apartment units. But after the purchase was made official, Silverstein instead decided to build a 1,100-foot tower with 1,400 apartments and a large retail component, Curbed New York reports.
But the best laid schemes of mice and men often go awry, and Silverstein has once again scrapped its plans and appears to be pursuing a different approach. The new plan, which, according to Crain’s, has not been set in stone, eliminates the supertall tower and goes back to a two-tower approach; one residential and one commercial.
This time, however, the project would be constructed in two phases. The first phase of the new plan would see a CetraRuddy-designed 600,000-sf condo tower rise on the site. Building the residential tower first would prove to be more lucrative and could help fund the construction of the second tower in phase two. The second tower would be the larger tower of the two, comprising 1.2 million sf of office space.
Plans have not been filed for the new two-tower project yet, however, and Silverstein is still exploring other options for the site. So don’t be too surprised if another change of plans occurs.
Related Stories
| Feb 14, 2012
Thornton Tomasetti names Al Hashimi vice president for its Middle East Operations
Al Hashimi is joining the company to help expand Thornton Tomasetti’s business in the region and support clients locally.
| Feb 8, 2012
World’s tallest solar PV-installation
The solar array is at the elevation of 737 feet, making the building the tallest in the world with a solar PV-installation on its roof.
| Jan 30, 2012
Hollister Construction Services to renovate 30 Montgomery Street in Jersey City, N.J.
Owner Onyx Equities hires firm to oversee comprehensive upgrades of office building.
| Jan 16, 2012
Mid-Continent Tower wins 25 Year Award from AIA Eastern Oklahoma
Designed by Dewberry, iconic tower defines Tulsa’s skyline.
| Jan 4, 2012
Shawmut Design & Construction awarded dorm renovations at Brown University
Construction is scheduled to begin in June 2012, and will be completed by December 2012.
| Jan 3, 2012
Rental Renaissance, The Rebirth of the Apartment Market
Across much of the U.S., apartment rents are rising, vacancy rates are falling. In just about every major urban area, new multifamily rental projects and major renovations are coming online. It may be too soon to pronounce the rental market fully recovered, but the trend is promising.
| Dec 27, 2011
Ground broken for adaptive reuse project
Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.
| Dec 21, 2011
BBI key to Philly high-rise renovation
The 200,000 sf building was recently outfitted with a new HVAC system and a state-of-the-art window retrofitting system.
| Dec 19, 2011
Chicago’s Aqua Tower wins international design award
Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.
| Dec 14, 2011
Belfer Research Building tops out in New York
Hundreds of construction trades people celebrate reaching the top of concrete structure for facility that will accelerate treatments and cures at world-renowned institution.