flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Site of former Motorola headquarters will become a mixed-use district

Mixed-Use

Site of former Motorola headquarters will become a mixed-use district

UrbanStreet Group and Antunovich Associates are developing the master plan for the project.


By David Malone, Associate Editor | June 13, 2019

All renderings courtesy Antunovich Associates

When Motorola decided to move its headquarters back to Chicago, it left a 225-acre campus vacant in Schaumburg, Ill. The large plot of land is now being redeveloped into a mixed-use living and entertainment district by UrbanStreet Group and Antunovich Associates.

Dubbed Veridian, the mixed-use development will feature residential space, office space, a hotel, entertainment, dining, and urban-style street retail. The site has been divided into multiple parcels of land, many of which will be sold to individual developers, with the goal being to bring an urban feel to the Chicago suburbs.

 

 

Currently, the development is set to feature the already completed Zurich headquarters; two parks, one measuring in at nine acres and one at 13 acres; a retirement village; an assisted living community; the Element at Veridian, a 260-unit luxury apartment building (set for completion in 2020); over 200 townhomes; a Top Golf; an atrium office building; a 220-key hotel; and a retail and entertainment “Town Center.” Motorola Solutions will also maintain a presence as one of Veridian’s corporate anchor tenants.

 

 

The retail and entertainment district will be highly walkable and include unique shopping and dining options. Additionally, it will host a variety of entertainment opportunities such as concerts, movies, and ice skating.

 

See Also: Gensler, Corgan reveal their design concepts for Uber Air Skyports

 

Antunovich Associates will initially be responsible for the planning and designing of the main Town Center parcel. This parcel will feature approximately 800,000 sf of built area within the retail core, not including the four parking structures that will support it. Construction on a new spine road and infrastructure is slated to begin later this year with phase one completion as soon as Fall of 2020.

 

 

 

Courtesy Veridian.

Tags

Related Stories

Mixed-Use | Aug 4, 2021

Diamond Schmitt to lead design for Therme Canada | Ontario Place redevelopment

The project will be a year-round waterfront destination.

Mixed-Use | Jul 16, 2021

SOM to lead the design of the 2026 Milan-Cortina Olympic Village

The project is part of the updated Porta Romana railway yard master plan.

Mixed-Use | Jun 30, 2021

Design details released about new development in Seattle’s vibrant Belltown district

Connecting the building, called Archetype, to the street, neighborhood, and bay is a key imperative.

Mixed-Use | Jun 21, 2021

Design team of Gensler and Manning selected to design The River District

The mixed-use neighborhood will be built along the Mississippi River in New Orleans.

Mixed-Use | Jun 17, 2021

London’s former Old War Office building set to become hotel and residences

The building had been closed to the public for over a century.

Mixed-Use | Jun 14, 2021

SB Architects and LandDesign unveil design for Rivana at Innovation Station

The development is located 25 miles west of downtown Washington, D.C.

Mixed-Use | Jun 10, 2021

Safdie Architects unveils design for ORCA Toronto

The project comprises nine towers in total.

Mixed-Use | Jun 7, 2021

Henning Larsen designs an active community hub for London

The project will be the firm’s first in London.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021