flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Site of former Motorola headquarters will become a mixed-use district

Mixed-Use

Site of former Motorola headquarters will become a mixed-use district

UrbanStreet Group and Antunovich Associates are developing the master plan for the project.


By David Malone, Associate Editor | June 13, 2019

All renderings courtesy Antunovich Associates

When Motorola decided to move its headquarters back to Chicago, it left a 225-acre campus vacant in Schaumburg, Ill. The large plot of land is now being redeveloped into a mixed-use living and entertainment district by UrbanStreet Group and Antunovich Associates.

Dubbed Veridian, the mixed-use development will feature residential space, office space, a hotel, entertainment, dining, and urban-style street retail. The site has been divided into multiple parcels of land, many of which will be sold to individual developers, with the goal being to bring an urban feel to the Chicago suburbs.

 

 

Currently, the development is set to feature the already completed Zurich headquarters; two parks, one measuring in at nine acres and one at 13 acres; a retirement village; an assisted living community; the Element at Veridian, a 260-unit luxury apartment building (set for completion in 2020); over 200 townhomes; a Top Golf; an atrium office building; a 220-key hotel; and a retail and entertainment “Town Center.” Motorola Solutions will also maintain a presence as one of Veridian’s corporate anchor tenants.

 

 

The retail and entertainment district will be highly walkable and include unique shopping and dining options. Additionally, it will host a variety of entertainment opportunities such as concerts, movies, and ice skating.

 

See Also: Gensler, Corgan reveal their design concepts for Uber Air Skyports

 

Antunovich Associates will initially be responsible for the planning and designing of the main Town Center parcel. This parcel will feature approximately 800,000 sf of built area within the retail core, not including the four parking structures that will support it. Construction on a new spine road and infrastructure is slated to begin later this year with phase one completion as soon as Fall of 2020.

 

 

 

Courtesy Veridian.

Tags

Related Stories

Mixed-Use | Jul 14, 2020

Apartments and condos occupy what was once a five-story car dealership

Wisznia | Architecture+Development designed, developed, and is managing the project.

Mixed-Use | Feb 21, 2020

SB Architects to design Fort Lauderdale’s FATVillage mixed-use destination

The project will build upon the existing FATVillage Arts District.

Mixed-Use | Feb 14, 2020

Kenya’s Pinnacle Tower will be the tallest tower in Africa

ArchGroup Consultants is designing the project.

Sustainability | Feb 12, 2020

KPF unveils The Pinnacle at Central Wharf, a high-performance, resilient tower

The project will reconnect Downtown Boston to the waterfront.

Mixed-Use | Feb 11, 2020

KTGY unveils designs for Downtown Superior’s Main Street mixed-use portion

The development will be built in Superior, Colo.

Mixed-Use | Feb 7, 2020

Rising to the occasion

Roof deck entertainment spaces are popular amenities that present engineering and code complexities.

Mixed-Use | Jan 27, 2020

Dubai’s One Za’abeel will have the world’s largest cantilever

Nikken Sekkei is designing the project.

Mixed-Use | Jan 17, 2020

RMJM designs conjoined, twisting towers in Hengyang, China

The towers will rise 580 feet.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021