flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Site of former Motorola headquarters will become a mixed-use district

Mixed-Use

Site of former Motorola headquarters will become a mixed-use district

UrbanStreet Group and Antunovich Associates are developing the master plan for the project.


By David Malone, Associate Editor | June 13, 2019

All renderings courtesy Antunovich Associates

When Motorola decided to move its headquarters back to Chicago, it left a 225-acre campus vacant in Schaumburg, Ill. The large plot of land is now being redeveloped into a mixed-use living and entertainment district by UrbanStreet Group and Antunovich Associates.

Dubbed Veridian, the mixed-use development will feature residential space, office space, a hotel, entertainment, dining, and urban-style street retail. The site has been divided into multiple parcels of land, many of which will be sold to individual developers, with the goal being to bring an urban feel to the Chicago suburbs.

 

 

Currently, the development is set to feature the already completed Zurich headquarters; two parks, one measuring in at nine acres and one at 13 acres; a retirement village; an assisted living community; the Element at Veridian, a 260-unit luxury apartment building (set for completion in 2020); over 200 townhomes; a Top Golf; an atrium office building; a 220-key hotel; and a retail and entertainment “Town Center.” Motorola Solutions will also maintain a presence as one of Veridian’s corporate anchor tenants.

 

 

The retail and entertainment district will be highly walkable and include unique shopping and dining options. Additionally, it will host a variety of entertainment opportunities such as concerts, movies, and ice skating.

 

See Also: Gensler, Corgan reveal their design concepts for Uber Air Skyports

 

Antunovich Associates will initially be responsible for the planning and designing of the main Town Center parcel. This parcel will feature approximately 800,000 sf of built area within the retail core, not including the four parking structures that will support it. Construction on a new spine road and infrastructure is slated to begin later this year with phase one completion as soon as Fall of 2020.

 

 

 

Courtesy Veridian.

Tags

Related Stories

Mixed-Use | Nov 5, 2018

44-acre mixed-use project completes in Northridge, Calif.

Ware Malcomb designed the project.

Mixed-Use | Oct 25, 2018

Philadelphia’s uCity Square kicks off major expansion drive

This innovation center has several office, lab, and residential buildings in the works.

Wood | Oct 19, 2018

Design revealed for mass-timber residential tower in Milwaukee

The developer is confident that the city will approve construction, which is scheduled to start next year.

Mixed-Use | Oct 4, 2018

Four-story hotel and adjacent affordable housing community opens in California’s Sonoma County

Axis/GFA Architecture and Design was the architect for the project.

Mixed-Use | Sep 25, 2018

Dexter Yard to provide Seattle with 540,000 sf of mixed-use space

SkB Architects designed the development.

Mixed-Use | Sep 14, 2018

Six-story structure combines a parking garage with street-level retail

Eskew+Dumez+Ripple designed the structure.

Reconstruction & Renovation | Aug 22, 2018

Former shopping mall becomes mixed-use urban complex in Beijing

Schmidt Hammer Lassen Architects designed the project.

Mixed-Use | Aug 13, 2018

Florida mixed-use development uses wellness as the backbone of its design

Zyscovich Architects designed the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021