flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skanska completes primary construction work on Nashville’s largest ever mixed-use project

Mixed-Use

Skanska completes primary construction work on Nashville’s largest ever mixed-use project

Gresham Smith is serving as architect-of-record for the entire project and is part of the design team with Pappageorge Haymes and Gensler.


By David Malone, Associate Editor | February 24, 2021
Fifth + Broadway aerial at night

Images courtesy Gresham Smith

Over the past four years, Nashville’s first convention center has been undergoing a transformation into Fifth + Broadway, a new mixed-use development comprising 2.2 million sf. The development represents the largest single phase mixed-use project in Nashville’s history.

Fifth + Broadway is designed to be a live/work/play district in the heart of downtown Nashville. It includes a 415-foot, 386-unit apartment tower and a 24-story office tower that comprises 372,000 sf of Class A office space and amenities. The residential tower will be the tallest for-rent apartment tower in Tennessee while the office tower will include amenities such as a 19,000 sf indoor/outdoor amenity deck.

 

Fifth + Broadway office corner

 

The project will also feature 239,000 sf of entertainment, retail, and cultural space. This will include The National Museum of African American Music and Assembly Food Hall, a multi-level dining and entertainment destination with over 20 restaurants and a music venue. Additionally, 2,253 parking spots will be spread across three separate structures.

 

Fifth + Broadway metropolis corner

 

On Feb. 24, Skanska announced the completion of the core of its work as general contractor on Fifth + Broadway in advance of its March 4 opening of retail and dining. Below are some of the project’s statistical highlights:

— Approximately 250,000 pounds of explosives were used for excavation during the development phase—approximately the weight in July Fourth fireworks that Americans purchase annually.

— 15,408 tons of concrete and 3,875 tons of steel have been recycled from the demolition of the Convention Center. This total weight is equal to nearly two Eiffel Towers.

— 70,750 tons of material have been recycled from construction debris—approximately the weight of 353 blue whales.

— 98,500 cubic yards of concrete were used for this project—equal to 29 Olympic Swimming Pools.

— During the construction of Fifth + Broadway, Skanska worked through the 2019 NFL draft and CMA Fest, which brought a combined 680,000 fans to Nashville.

— 7,000 workers made this project possible, and they included 105 prime subcontractors and 61 small, minority-owned, women-owned and veteran subcontractors. The project is tracking more than $70 million to be spent on diverse businesses throughout construction.

— Skanska has logged 3.2 million work hours to date.

— If Fifth + Broadway’s three towers were stacked on top of each other, they would measure 894 feet high—equivalent to the Rockefeller Center in New York City.

— There are 1,600 stairs in Fifth + Broadway’s residential tower leading to 386 apartment units for rent.

— Fifth + Broadway’s parking garage can hold 2,145 cars, which, if parked bumper to bumper, would stretch from the Country Music Hall of Fame and Museum to the Nashville Zoo.

 

Fifth + Broadway Aerial

 

Fifth + Broadway residential deck

 

Fifth + Broadway aerial photo

Tags

Related Stories

Mixed-Use | Jul 14, 2020

Apartments and condos occupy what was once a five-story car dealership

Wisznia | Architecture+Development designed, developed, and is managing the project.

Mixed-Use | Feb 21, 2020

SB Architects to design Fort Lauderdale’s FATVillage mixed-use destination

The project will build upon the existing FATVillage Arts District.

Mixed-Use | Feb 14, 2020

Kenya’s Pinnacle Tower will be the tallest tower in Africa

ArchGroup Consultants is designing the project.

Sustainability | Feb 12, 2020

KPF unveils The Pinnacle at Central Wharf, a high-performance, resilient tower

The project will reconnect Downtown Boston to the waterfront.

Mixed-Use | Feb 11, 2020

KTGY unveils designs for Downtown Superior’s Main Street mixed-use portion

The development will be built in Superior, Colo.

Mixed-Use | Feb 7, 2020

Rising to the occasion

Roof deck entertainment spaces are popular amenities that present engineering and code complexities.

Mixed-Use | Jan 27, 2020

Dubai’s One Za’abeel will have the world’s largest cantilever

Nikken Sekkei is designing the project.

Mixed-Use | Jan 17, 2020

RMJM designs conjoined, twisting towers in Hengyang, China

The towers will rise 580 feet.

Mixed-Use | Dec 18, 2019

BIG unveils River Street Waterfront Master Plan for Williamsburg

The project is a collaboration between BIG, Two Trees Management, and James Corner Field Operations.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021