flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skanska completes primary construction work on Nashville’s largest ever mixed-use project

Mixed-Use

Skanska completes primary construction work on Nashville’s largest ever mixed-use project

Gresham Smith is serving as architect-of-record for the entire project and is part of the design team with Pappageorge Haymes and Gensler.


By David Malone, Associate Editor | February 24, 2021
Fifth + Broadway aerial at night

Images courtesy Gresham Smith

Over the past four years, Nashville’s first convention center has been undergoing a transformation into Fifth + Broadway, a new mixed-use development comprising 2.2 million sf. The development represents the largest single phase mixed-use project in Nashville’s history.

Fifth + Broadway is designed to be a live/work/play district in the heart of downtown Nashville. It includes a 415-foot, 386-unit apartment tower and a 24-story office tower that comprises 372,000 sf of Class A office space and amenities. The residential tower will be the tallest for-rent apartment tower in Tennessee while the office tower will include amenities such as a 19,000 sf indoor/outdoor amenity deck.

 

Fifth + Broadway office corner

 

The project will also feature 239,000 sf of entertainment, retail, and cultural space. This will include The National Museum of African American Music and Assembly Food Hall, a multi-level dining and entertainment destination with over 20 restaurants and a music venue. Additionally, 2,253 parking spots will be spread across three separate structures.

 

Fifth + Broadway metropolis corner

 

On Feb. 24, Skanska announced the completion of the core of its work as general contractor on Fifth + Broadway in advance of its March 4 opening of retail and dining. Below are some of the project’s statistical highlights:

— Approximately 250,000 pounds of explosives were used for excavation during the development phase—approximately the weight in July Fourth fireworks that Americans purchase annually.

— 15,408 tons of concrete and 3,875 tons of steel have been recycled from the demolition of the Convention Center. This total weight is equal to nearly two Eiffel Towers.

— 70,750 tons of material have been recycled from construction debris—approximately the weight of 353 blue whales.

— 98,500 cubic yards of concrete were used for this project—equal to 29 Olympic Swimming Pools.

— During the construction of Fifth + Broadway, Skanska worked through the 2019 NFL draft and CMA Fest, which brought a combined 680,000 fans to Nashville.

— 7,000 workers made this project possible, and they included 105 prime subcontractors and 61 small, minority-owned, women-owned and veteran subcontractors. The project is tracking more than $70 million to be spent on diverse businesses throughout construction.

— Skanska has logged 3.2 million work hours to date.

— If Fifth + Broadway’s three towers were stacked on top of each other, they would measure 894 feet high—equivalent to the Rockefeller Center in New York City.

— There are 1,600 stairs in Fifth + Broadway’s residential tower leading to 386 apartment units for rent.

— Fifth + Broadway’s parking garage can hold 2,145 cars, which, if parked bumper to bumper, would stretch from the Country Music Hall of Fame and Museum to the Nashville Zoo.

 

Fifth + Broadway Aerial

 

Fifth + Broadway residential deck

 

Fifth + Broadway aerial photo

Tags

Related Stories

Mixed-Use | Nov 1, 2017

18-story residential tower breaks ground near Temple University

The tower will provide apartment units for students and young professionals.

Mixed-Use | Oct 19, 2017

Mixed-use Dubai tower will have the world’s tallest ceramic facade

The 63-story tower will house a Mandarin Oriental hotel, residences, and restaurants.

Mixed-Use | Oct 6, 2017

Omaha gets its first entertainment district

Leo A Daly designed the mixed-use development, which takes advantage of a new city ordinance that allows alcoholic beverages outdoors.

High-rise Construction | Oct 4, 2017

90-story mixed-use building could become Denver’s first supertall tower

Manhattan-based Greenwich Realty Capital is developing the project.

Reconstruction & Renovation | Sep 28, 2017

Plans for Chicago’s historic Post Office building revealed by 601W Companies and Gensler

The redevelopment project is currently the largest in the nation.

Mixed-Use | Sep 26, 2017

Perkins+Will designs new international business community in Cali, Colombia

The new free trade zone is designed to resemble a small village.

Mixed-Use | Sep 25, 2017

Getting there is half the fun: Mass transit helps entertainment districts thrive

In Los Angeles, the entertainment district L.A. Live is expected to benefit from the proposed expansion of the city’s mass transit system.

Mixed-Use | Sep 25, 2017

One of L.A.’s most sought-after neighborhoods receives a new mixed-use development

The new development will feature 166 units and 9,000 sf of ground-floor retail.

Mixed-Use | Sep 22, 2017

Defending against the online dragon

Some entertainment districts are going light on retail, partly because “the bulk of the leasing demand is for dining and entertainment,” say Barry Hand, a Principal with design mega-firm Gensler in Dallas.

Mixed-Use | Sep 21, 2017

Entire living rooms become balconies in a new Lower East Side mixed-used development

NanaWall panels add a unique dimension to condos at 60 Orchard Street in New York City.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021