A joint venture of Skanska USA and Moss & Associates was awarded an $80 million contract to expand and renovate the Greenville-Spartanburg International Airport terminal in South Carolina.
The multi-phase terminal improvement program consists of an overall expansion to the airport’s footprint and major renovations to the existing airport terminal. These renovations will improve overall passenger flow and upgrade the airport to meet recently enhanced Transportation Security Administration (TSA) standards for security and processing.
Work will begin in December 2011 and is slated to complete in June 2014. As construction manager at-risk, Skanska Moss is responsible for all preconstruction, construction management and post-construction services. The program also includes temporary facilities, multiple and phased tenant relocations and baggage handling improvements. BD+C
Related Stories
| Aug 11, 2010
Jacobs, HDR top BD+C's ranking of the nation's 100 largest institutional building design firms
A ranking of the Top 100 Institutional Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Earthquake engineering keeps airport grounded
Istanbul, Turkey's new 2.15 million-sf Sabiha Gökçen International Airport opened on October 31, 2009, becoming the world's largest seismically isolated building. Arup's global airport planning and engineering team, in collaboration with architects Dogan Tekeli Sami Sisa Mimarlik Ofisi and contractor LIMAK-GMR JV, working within an 18-month timeline, designed and built the facility wi...