S/L/A/M Collaborative, the national architectural firm based in Glastonbury, Conn., on March 6 completed its acquisition of five Heery architectural design practices from CBRE. The terms of the purchase were not disclosed.
The practices—focused on healthcare, sports facilities, and justice—are now known as Heery Design, a SLAM Studio. CBRE had owned Heery International, a project management and design engineering firm based in Atlanta, since October 2017 when it acquired the business for $57 million from Balfour Beatty. After the deal with S/L/A/M, CBRE retains full ownership of Heery’s interior design and engineering businesses that are integral to its project management services.
About 70 of Heery’s employees are coming over in this deal, joining 210 S/L/A/M professionals. Heery’s healthcare practice is located in Denver, Iowa City, Iowa, and Philadelphia. Its justice practice is in Orlando, Fla. And its sports design practice is in Atlanta. Heery Design offices associated with these practices are also part of this acquisition, along with the firm’s architectural book of business.
“The professionals joining S/L/A/M in this transaction are returning to a traditional design firm that values creativity, and is passionate about design,” said Richard T. Connell, FAIA, S/L/A/M’s chairman, in a prepared statement. Those professionals include Heery Design’s managing directors Russ Sedmak, Mike Holleman, and Douglas Kleppin, AIA, LEED AP.
S/L/A/M’s design portfolio includes healthcare, education, corporate and sports facilities. The firm provides integrated landscape architecture, structural engineering, interior design and construction services, with offices in Connecticut, New York, Atlanta, Boston, and Los Angeles.
A source knowledgeable about this deal, who spoke on background, said that a third party representing CBRE had approached a handful of firms, including S/L/A/M, at the beginning of 2018 about their interest in acquiring parts of Heery. This source said that CBRE was primarily interested in finding a buyer willing to acquire all five of the practices it wanted to shed.
This source adds that what CBRE is holding onto from its Heery purchase is a “much larger” piece than what it is selling to S/L/A/M.
Related Stories
| Oct 4, 2012
Electronic power tool builds project transparency
As building projects have grown in scope and complexity, so, too, has the task of document management. A new online tool is helping Building Teams meet that demand.
| Oct 4, 2012
HMC Architects in service to the community
HMC employees give back to their communities through toy drives and fundraising efforts like CANstruction, which benefits local food banks.
| Oct 4, 2012
Career development, workplace environment programs key to retention at HMC Architects
Architecture firm take a multifaceted approach to professional development.
| Oct 4, 2012
Foundation tightens HMC Architects bond with local communities
Founded in 2009 with an initial endowment of $1.9 million, HMC’s nonprofit Designing Futures Foundation (DFF) has donated about $230,000 in its three years of existence, including $105,000 in scholarships to California students. The grants help promising high schoolers with an interest in architecture, design, engineering, education, or healthcare pay for expenses like test preparation services, computers, and college entrance exam fees and tuition. The scholarships can be extended for up to five years of college.
| Oct 4, 2012
Gilbane publishes Fall 2012 construction industry economic report
Report outlines fluctuation in construction spending; predicts continued movement toward recovery.
| Oct 3, 2012
Fifth public comment period now open for update to USGBC's LEED Green Building Program
LEED v4 drafts and the public comment tool are now available on the newly re-launched, re-envisioned USGBC.org website.
| Oct 2, 2012
Mirvish and Gehry unveil conceptual design to transform Toronto’s entertainment district
Reimagining of King Street Entertainment District supports Toronto’s cultural corridor.
| Oct 2, 2012
Dow Business Services Center building named 2012 “America’s Best Buildings of the Year” winner
Building constructed with air sealing and insulation products from Dow Building Solutions.
| Oct 2, 2012
Bernards working on project at L.A. White Memorial Medical Center
The new facility is a $15-million, 41,000-sf concrete structure which includes three stories of medical office space atop a three-level parking garage.
| Oct 1, 2012
Tyco completes separation process, now largest pure-play fire protection and security business
Tyco Integrated Security focused on delivering security solutions to commercial businesses.