The University of Colorado Denver selected SmithGroup to design a new engineering, design, and computing building that will serve as anchor of new downtown innovation district. The project is part of a major goal of CU Denver’s visionary 2030 Strategic Plan to cultivate new technology, partnerships, programming, diverse talent, and in-demand jobs in one hub located in the heart of Denver, according to a university press release.
The building will support research in key areas like artificial intelligence, cybersecurity, and robotics. This work will be focused on areas where emerging technologies are transformative such as health, construction, manufacturing, cities, and space. Chancellor Michelle Marks said the project will bolster the Speer Boulevard corridor, and help create a more equitable engineering education and workforce talent pipeline.
Strategically Designed for Engineering, Design, & Computing
Martin Dunn, dean of the College of Engineering, Design and Computing (CEDC), said the building will be a gamechanger by serving students with cutting-edge facilities that support computing and design-oriented curricula and pedagogy. “This is essential as technology is changing faster than ever, and industry is asking engineers to do new types of work that require increased creativity, teamwork, and collaboration across disciplines,” Dunn said.
The university cited SmithGroup’s alignment with C.U. Denver’s values of diversity, equity, sustainability, and innovation for choosing the firm. SmithGroup aims to involve the campus and community in its planning process.
The firm will host a series of town halls to share updates and gather feedback. At the March design team kickoff meeting, Marks left SmithGroup representatives with a bold request: “I want you to do something bigger and better and different than anyone has done before.”
Construction is slated to begin in late 2022, with a planned opening before the start of the 2024-25 academic year.
Owner and/or developer: University of Colorado Denver
Design architect: SmithGroup
Architect of record: SmithGroup
MEP engineer: SmithGroup
Structural engineer: Martin/Martin Consulting Engineers
General contractor/construction manager: McCarthy Building Companies
Related Stories
University Buildings | Dec 13, 2020
U. of Oregon’s new Knight Campus is set up to turn ideas into reality
Its design encourages occupant productivity and well-being.
Giants 400 | Dec 3, 2020
2020 Science & Technology Facilities Giants: Top architecture, engineering, and construction firms in the S+T sector
HDR, Jacobs, and Turner head BD+C's rankings of the nation's largest science and technology (S+T) facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.
Giants 400 | Dec 2, 2020
2020 University Giants: Top architecture, engineering, and construction firms in the higher education sector
Gensler, AECOM, and Turner Construction top BD+C's rankings of the nation's largest university sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.
University Buildings | Nov 25, 2020
Stanford bioresearch quad's new public art piece, “Morphogenesis”
Stanford University's Morphogenesis installation connects user interaction with a large-scale media mesh platform.
University Buildings | Nov 20, 2020
Why precast concrete is an appealing choice for student housing
A variety of material solutions are emerging to accelerate construction timelines, and precast concrete has become an attractive option.
Laboratories | Nov 16, 2020
Washington State University’s new Plant Sciences Building opens
LMN Architects designed the project.
AEC Tech | Nov 12, 2020
The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage
BD+C editors speak with experts from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot on the November 12 episode of "The Weekly." The episode is available for viewing on demand.
University Buildings | Nov 5, 2020
BIG selected to design new Student Center for Johns Hopkins University
The new center will become the heart of the university’s campus.
Smart Buildings | Oct 26, 2020
World’s first smart building assessment and rating program released
The SPIRE Smart Building Program will help building owners and operators make better investment decisions, improve tenant satisfaction, and increase asset value.
Building Team Awards | Oct 24, 2020
Emory University Student Center wins the top award in 2020 Building Team Awards
Emory University Student Center wins the top award in 2020 Building Team Awards