Designed by Snøhetta in collaboration with Clark Nexsen, Charlotte Mecklenburg Library’s new Main Library is a 115,000-sf building that will go beyond being just a library to serve as a public commons.
The technologically-advanced, five-story library’s design draws on the concept of the ridgeline literally and figuratively as it generates views in a variety of directions and acts as a convergence point for community and culture. A glowing, translucent prow cantilevers out over the sidewalk, opening the building up to the street.
At street level, the facade is glazed in a transparent band of glass that wraps the tapered corner to allow views deep into the library, putting the activity within on display. The main entry is framed by a copper soffit and has the potential to be connected to the historic McGlohon Theatre and Duke Energy Theater next door to form a new civic space. The sloped front facade is clad in ceramic panels and resembles a patterned textile to modulate light conditions within.
Inside the building a large atrium opens up to the top floor for easy wayfinding. A spiraling wooden stair leads up to the four floors above with each level offering unique views of the surrounding city via large windows and outdoor terrace spaces.
Each level is designed with a specific thematic focus:
Lower Level: houses a pre-function and event space
Level 1: includes the two main entrances as well as a café entrance, lobby, café, theater area, reading zones, and self-service checkpoints.
Level 2: features the welcome and orientation center for new and recent Mecklenburg residents, with a job training center and counseling services space and the core technology and makerspace offerings, including a technology center, computer lab, digital visualization lab, and recording studios.
See Also: 2019 Cultural Facility Giants Report: New libraries are all about community
Level 3: houses the bulk of the collections and offers soft seating for reading and research along with staff space.
Level 4: showcases the revamped Robinson-Spangler Carolina Room, which features the library’s special collections and a theater and staff space.
Level 5: houses the destination reading room, a writer’s studio and porch, and an outdoor terrace which serves as a reading, programming and meeting space, along with administrative offices.
The library is slated to break ground in early 2021 and complete and re-open in 2024.
Related Stories
| Apr 16, 2014
Upgrading windows: repair, refurbish, or retrofit [AIA course]
Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Mar 31, 2014
Extreme conversion: Soaring Canadian church transformed into contemporary library
Even before the St. Denys-du-Plateau Church was converted into a library, it was an unusual building, with a towering nave designed to mimic a huge tent inflated by the wind.
| Mar 26, 2014
Callison launches sustainable design tool with 84 proven strategies
Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.
| Mar 13, 2014
Do you really 'always turn right'?
The first visitor center we designed was the Ernest F. Coe Visitor Center for the Everglades National Park in 1993. I remember it well for a variety of reasons, not the least of which was the ongoing dialogue we had with our retail consultant. He insisted that the gift shop be located on the right as one exited the visitor center because people “always turn right.”
| Mar 12, 2014
14 new ideas for doors and door hardware
From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations.
| Feb 14, 2014
Crowdsourced Placemaking: How people will help shape architecture
The rise of mobile devices and social media, coupled with the use of advanced survey tools and interactive mapping apps, has created a powerful conduit through which Building Teams can capture real-time data on the public. For the first time, the masses can have a real say in how the built environment around them is formed—that is, if Building Teams are willing to listen.
| Jan 28, 2014
16 awe-inspiring interior designs from around the world [slideshow]
The International Interior Design Association released the winners of its 4th Annual Global Excellence Awards. Here's a recap of the winning projects.