Designed by Snøhetta in collaboration with Clark Nexsen, Charlotte Mecklenburg Library’s new Main Library is a 115,000-sf building that will go beyond being just a library to serve as a public commons.
The technologically-advanced, five-story library’s design draws on the concept of the ridgeline literally and figuratively as it generates views in a variety of directions and acts as a convergence point for community and culture. A glowing, translucent prow cantilevers out over the sidewalk, opening the building up to the street.
At street level, the facade is glazed in a transparent band of glass that wraps the tapered corner to allow views deep into the library, putting the activity within on display. The main entry is framed by a copper soffit and has the potential to be connected to the historic McGlohon Theatre and Duke Energy Theater next door to form a new civic space. The sloped front facade is clad in ceramic panels and resembles a patterned textile to modulate light conditions within.
Inside the building a large atrium opens up to the top floor for easy wayfinding. A spiraling wooden stair leads up to the four floors above with each level offering unique views of the surrounding city via large windows and outdoor terrace spaces.
Each level is designed with a specific thematic focus:
Lower Level: houses a pre-function and event space
Level 1: includes the two main entrances as well as a café entrance, lobby, café, theater area, reading zones, and self-service checkpoints.
Level 2: features the welcome and orientation center for new and recent Mecklenburg residents, with a job training center and counseling services space and the core technology and makerspace offerings, including a technology center, computer lab, digital visualization lab, and recording studios.
See Also: 2019 Cultural Facility Giants Report: New libraries are all about community
Level 3: houses the bulk of the collections and offers soft seating for reading and research along with staff space.
Level 4: showcases the revamped Robinson-Spangler Carolina Room, which features the library’s special collections and a theater and staff space.
Level 5: houses the destination reading room, a writer’s studio and porch, and an outdoor terrace which serves as a reading, programming and meeting space, along with administrative offices.
The library is slated to break ground in early 2021 and complete and re-open in 2024.
Related Stories
| Nov 15, 2013
Greenbuild 2013 Report - BD+C Exclusive
The BD+C editorial team brings you this special report on the latest green building trends across nine key market sectors.
| Nov 13, 2013
Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study
The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.
| Oct 30, 2013
11 hot BIM/VDC topics for 2013
If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics.
| Oct 28, 2013
Urban growth doesn’t have to destroy nature—it can work with it
Our collective desire to live in cities has never been stronger. According to the World Health Organization, 60% of the world’s population will live in a city by 2030. As urban populations swell, what people demand from their cities is evolving.
| Oct 23, 2013
Gehry, Foster join Battersea Power Station redevelopment
Norman Foster and Frank Gehry have been selected to design a retail section within the £8 billion redevelopment of Battersea Power Station in London.
| Oct 18, 2013
Researchers discover tension-fusing properties of metal
When a group of MIT researchers recently discovered that stress can cause metal alloy to fuse rather than break apart, they assumed it must be a mistake. It wasn't. The surprising finding could lead to self-healing materials that repair early damage before it has a chance to spread.
| Oct 15, 2013
Cass Gilbert's landmark St. Louis Central Library gets a reboot
A $70 million project returns large sections of the building to their original Beaux Arts beauty, while modernizing the spaces to make them more inviting and useful for today’s patrons.
| Sep 19, 2013
What we can learn from the world’s greenest buildings
Renowned green building author, Jerry Yudelson, offers five valuable lessons for designers, contractors, and building owners, based on a study of 55 high-performance projects from around the world.
| Sep 19, 2013
6 emerging energy-management glazing technologies
Phase-change materials, electrochromic glass, and building-integrated PVs are among the breakthrough glazing technologies that are taking energy performance to a new level.
| Sep 19, 2013
Roof renovation tips: Making the choice between overlayment and tear-off
When embarking upon a roofing renovation project, one of the first decisions for the Building Team is whether to tear off and replace the existing roof or to overlay the new roof right on top of the old one. Roofing experts offer guidance on making this assessment.