flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SOM-designed mixed-use tower opens in Sydney

Mixed-Use

SOM-designed mixed-use tower opens in Sydney

The building is located in Sydney’s Central Business District.


By David Malone, Associate Editor | June 20, 2019

All photos courtesy Brett Boardman

SOM, Architectus, and Dexus Property Group recently completed work on 100 Mount Street, a new 39-story glass-enclosed tower in Sydney’s Central Business District.

The tower’s design was inspired by Sydney’s architectural landscape, but is evocative of another SOM-designed building half a world away: Chicago’s John Hancock Center. 100 Mount is supported by a cross-braced exoskeleton structure and anchored by an offset core. It is clad in a glass curtain wall which enables views of Sydney Harbour, the Sydney Opera House, and Sydney Harbour Bridge.

 

 

At the ground level, the building’s offset core allows for a series of open-concept spaces, such as a commercial lobby, café, and restaurant. Outside in the landscaped public plaza, cascading steps and inclined pathways provide visitors with access to new street-level retail. The retail storefronts are located along Walker Street, while street level activity continues around the corner of Mount Street and into the through-site link. A pedestrian pathway bisects the site to connect the building to public transit.

 

 

In addition to the building’s automatic daylight control and glare reduction, chilled beam systems help to reduce the building’s environmental footprint. 100 Mount Street is targeting 5-star ratings on the Australian Green Star and National Australian Built Environment Rating Systems. The International WELL Building Institute has awarded 100 Mount Street the WELL Core & Shell Gold Pre-certification.

 

See Also: Frank Lloyd Wright Trust announces new Visitor and Education Center

 

SOM served as design and structural architect. Architectus was the architect of record, Enstruct was the engineer of record, and Arup was the MEP engineer.

 

 

Tags

Related Stories

Mixed-Use | Sep 23, 2020

SOM-designed waterfront neighborhood will include 1,045-foot-tall tower

The project will focus on harnessing the sea and the sun to create a low-carbon waterfront community.

Mixed-Use | Sep 7, 2020

Google proposes 40-acre redevelopment that includes nearly 2,000 housing units

Lendlease will manage the design and construction, as a partner in a multi-development deal struck last year between the two companies.

Mixed-Use | Sep 3, 2020

10 Design will redevelop the Nanjing Dajiaochang Airport

The old military airport will become a contemporary mixed-use destination.

Mixed-Use | Aug 17, 2020

New Sydney towers will have the world’s first AI-driven facade system

SOM and Fender Katsalidis are designing the project.

Mixed-Use | Aug 4, 2020

San Jose’s new tallest building tops out

Steinberg Hart designed the project.

Mixed-Use | Jul 27, 2020

$92 million reconstruction of St. Petersburg Municipal Pier completes

Rogers Partners, ASD | SKY, and landscape architect Ken Smith Workshop designed the project.

Mixed-Use | Jul 22, 2020

Skanska selects Pickard Chilton to design innovative office tower in Bellevue, Wash.

The 800,000-gsf mixed-use project is located at 10660 NE 8th Street.

Mixed-Use | Jul 21, 2020

Phase one of The Orbit masterplan detailed for Innisfil, Ontario

Partisans is designing the project.

Mixed-Use | Jul 20, 2020

J. Small Investments, Lyda Hill Philanthropies have unveiled plans for a 23-acre mixed-use development in Dallas

The vacant campus was purchased from ExxonMobil Oil Corporation in 2015.

Mixed-Use | Jul 17, 2020

Ryan Companies breaks ground on 122-acre Highland Bridge redevelopment in St. Paul, Minn.

The community’s goal is to provide 100% renewable energy to its houses and businesses.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021