flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SOM-designed office tower aims to promote health and wellness

Office Buildings

SOM-designed office tower aims to promote health and wellness

A mixed-use building in Chicago’s Fulton Market neighborhood blends the old with the new.


By Novid Parsi, Contributing Editor | April 11, 2022
800 Fulton Market
Designed by SOM, 800 Fulton Market relates to the rhythm and scale of the neighborhood’s historic low-rise streetscape as well as Chicago downtown high rises through a series of stepped terraces. All photos: © Dave Burk | SOM

Skidmore, Owings & Merrill (SOM) recently completed work on 800 Fulton Market, a new mixed-use office building in Chicago’s historic Fulton Market/West Loop neighborhood. The tower applies innovations in pandemic-responsive design, leveraging capacity-monitoring technology and ample outdoor space to promote tenant safety, health, and wellness. 

The 800 Fulton tower features smart building systems. Assistive technology enables availability and capacity monitoring for conference rooms and amenity spaces and tracks paper product usage, while mechanical systems cycle fresh air throughout the building. The project is targeting both LEED Platinum and WELL Building Standard certification.

The 19-floor design also reflects the rhythm and scale of the Fulton Market District’s historic low-rise streetscape. From a three-story podium, the building rises in stepped terraces that create landscaped outdoor spaces with native planting and trees.

800 Fulton Market ext 2
800 Fulton Market features a range of smart building systems that promote wellness, sustainability, and energy efficiency.

External steel brace frames on the east and west elevations have been engineered with Chicago’s harsh winters in mind. The central node of each brace moves closer to the facade as the braces cool and contract—and further from the facade as the braces heat up and expand. Through an expected range of about 9 inches of thermal movements, the braces are effective at resisting wind loads. Together with an offset cantilevered core made of glass, this structural system enables large, open floor plates and flexible, light-filled workspaces.

800 Fulton Market interior
Inside, a triple height main lobby is defined by a cantilevered staircase and mezzanine that create layered spaces of activity.

Inside, a nearly 40-foot-tall main lobby is defined by a cantilevered staircase and mezzanine that create layered spaces of activity. With exposed concrete, wood, and red brick, the lobby mimics the tower’s exterior and draws inspiration from the neighborhood’s industrial history. With flexible workstations and seating, the lobby also serves as an interactive space that blends seamlessly with the busy streetscape.

The rooftop bar and terraces on the 18th and 19th floors offer panoramic views of the surrounding city. The building also includes retail, community and conferencing spaces, a fitness center, and a lounge. 

The building team includes:
Owner and developer: Thor Equities, QuadReal 
Design architect: Skidmore, Owings & Merrill (SOM)
Architect of record: SOM
MEP engineer: dbHMS
Structural engineer: SOM 
General contractor/construction manager: Lendlease

800 Fulton Market interior 2
A vibrant mix of retail, community and conferencing spaces, a fitness center and lounge activate the site throughout the day.

Related Stories

Coronavirus | Jan 20, 2022

Advances and challenges in improving indoor air quality in commercial buildings

Michael Dreidger, CEO of IAQ tech startup Airsset speaks with BD+C's John Caulfield about how building owners and property managers can improve their buildings' air quality.

3D Printing | Jan 12, 2022

Using 3D-printed molds to create unitized window forms

COOKFOX designer Pam Campbell and Gate Precast's Mo Wright discuss the use of 3D-printed molds from Oak Ridge National Lab to create unitized window panels for One South First, a residential-commercial high-rise in Brooklyn, N.Y.

Headquarters | Oct 28, 2021

Florida’s Seagate Development Group tackles design-build projects from a developer’s vantage

A “single point of contact” for clients, says its CEO.

Office Buildings | Oct 26, 2021

A massive office reno project in Detroit sought to create destination spaces for returning workers

The interior design firm Pophouse relied heavily on employee input for a pilot remodel.

Cladding and Facade Systems | Oct 26, 2021

14 projects recognized by DOE for high-performance building envelope design

The inaugural class of DOE’s Better Buildings Building Envelope Campaign includes a medical office building that uses hybrid vacuum-insulated glass and a net-zero concrete-and-timber community center.

Office Buildings | Oct 21, 2021

Swinerton opens new regional headquarters in Charlotte

Redline Design Group designed the adaptive reuse project.

Office Buildings | Oct 18, 2021

Henning Larsen designs new headquarters building for KAB

The project is located in Copenhagen.

Office Buildings | Sep 29, 2021

Walmart’s new Home Office is the largest mass timber campus project in the U.S.

The project will occupy approximately 350 acres.

Mixed-Use | Sep 28, 2021

BIG designs new Farfetch HQ on the slopes of Leça River in Porto

The project is situated within the larger Fuse Valley site.

boombox1
boombox2
native1

More In Category



Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021