BIG has unveiled the design for a new headquarters building for Farfetch, a luxury online fashion platform. The purpose-built “fashion village” will be built on the slopes of Leça River in Porto, Portugal and is part of the larger Fuse Valley site. Fuse Valley, also designed by BIG, will feature 24 buildings that will be home to various tech companies, startups, and services.
“Rather than a corporate office complex, Farfetch’s future home in Fuse Valley will be a lively urban ensemble bringing every curator, creator, customer and collaborator together in the most innovative new neighborhood of the city,” said Bjarke Ingels, Founder and Creative Director, BIG, in a release. “The urban fabric will allow Fuse Valley to grow and expand organically, like a natural village.”
The Farfetch project will feature 12 interconnected buildings that each represent the various elements of the company’s organization, with the design of each space tailored accordingly. BIG’s design will amplify the exchange of ideas between the different aspects of the organization and create new opportunities for the approximately 3,000 Farfetch employees based in Portugal, visitors, and locals.
SEE ALSO: New resort will be carved directly into a mountainside
Fuse Valley as a whole is organized around plazas, parks, and courtyards that are landscaped and programmed to connect the indoors with the outdoors. Individual buildings rest on a series of urban terraces connecting the main road to the east with the Leça River to the west. Along the central arrival axis, an urban alley will open all the way from the street to the river. It will feature all the major public programs and amenities along the riverfront of Farfetch, including lobbies, an academy, an auditorium, a canteen, and wellness facilities.
The project will be a manmade extension of the hillside. The roofs of the new buildings will rise and fall to create peaks and valleys with slopes and terraces providing employees with open spaces to enjoy breaks and host gatherings. Paths will extend from the landscape to the roofscape, creating flexible way finding for people to move around the complex.
Facades will recede at the ground flow to expand the public realm and create natural canopies to welcome visitors. The chamfered corners of the buildings will merge to create archways and openings between the courtyards that will act like canvases for different artistic expressions. Atelier-like attics with additional ceiling heights and open mezzanines will be created by the sloping roofs of the buildings. Open connections extend from the attic mezzanines all the way to the ground to create visual and physical connectivity across all floors.
The interior of all the buildings will prioritize an immersion in nature and provide a biophilic environment that will increase productivity and wellbeing. The vegetation will also provide a naturally shaded and cooled environment.
The Farfetch HQ project is slated to break ground in early 2023 and open in 2025.
Related Stories
Mixed-Use | Oct 7, 2024
New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment
Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.
Affordable Housing | Oct 4, 2024
3 new affordable housing projects for October 2024
As affordable housing continues to grow, more projects are looking to diversify their footprint by adding mixed-use components, community areas, and more.
Mixed-Use | Sep 19, 2024
A Toronto development will transform a 32-acre shopping center site into a mixed-use urban neighborhood
Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.
Mixed-Use | Sep 10, 2024
Centennial Yards, a $5 billion mixed-use development in downtown Atlanta, tops out its first residential tower
Centennial Yards Company has topped out The Mitchell, the first residential tower of Centennial Yards, a $5 billion mixed-use development in downtown Atlanta. Construction of the apartment building is expected to be complete by the middle of next year, with first move-ins slated for summer 2025.
Codes and Standards | Sep 3, 2024
Atlanta aims to crack down on blighted properties with new tax
A new Atlanta law is intended to crack down on absentee landlords including commercial property owners and clean up neglected properties. The “Blight Tax” allows city officials to put levies on blighted property owners up to 25 times higher than current millage rates.
Building Technology | Aug 23, 2024
Top-down construction: Streamlining the building process | BD+C
Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.
Mixed-Use | Aug 21, 2024
Adaptive reuse of a Sears store becomes luxury mixed-use housing
6 Corners Lofts at 4714 W Irving Park Road, Chicago, Ill., opened in March of 2024 as a 394,000-sf adaptive reuse project born out of a former Sears store.
Curtain Wall | Aug 15, 2024
7 steps to investigating curtain wall leaks
It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus.
Adaptive Reuse | Aug 14, 2024
Adaptive reuse revives a former warehouse in St. Louis
The Victor, as the building is now called, has nearly 400 residential apartments.
Adaptive Reuse | Aug 14, 2024
KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London
8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.