flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SOM unveils design for 54-story mixed-use tower in Hangzhou, China

Mixed-Use

SOM unveils design for 54-story mixed-use tower in Hangzhou, China

The tower will rise 944 feet.


By David Malone, Associate Editor | April 5, 2018
The Hangzhou Wangchao center in China

Courtesy SOM | Brick Visual

Skidmore, Owings & Merrill (SOM) recently unveiled the design for the Hangzhou Wangchao Center in Hangzhou, China. The tower will add 125,000 sm of office, hotel, and retail space directly adjacent to one of the city’s new subway stations.

The tower’s silhouette is the result of an efficient structural system that minimizes wind loads with eight mega-columns that slope outward at the corners to create large, flexible floor plates. As the corner columns move farther apart, secondary perimeter columns branch out to maintain equal bays.

At the tower’s crown, the primary corner columns extend upward to a truss at the top level. Hangers and spandrels are braced back to the central concrete core with a series of struts that work in tandem to support MEP equipment and conceal the building maintenance systems.

Above the lobby, a Vierendeel transfer truss links the secondary columns to the corner columns, which creates an open lobby space below. The cladding on the undulating façade consists of planar glass panels.

"The Hangzhou Wangchao Center's distinctive silhouette derives its form from an integrated design process that solves programmatic, structural, and environmental criteria,” says SOM Design Partner, Gary Haney, in a release. “Located at the intersection of several major transportation networks, the tower is a beacon of performance-driven design and is emblematic of Hangzhou's future as a new global destination."

The Hangzhou Wangchao Center is slated for completion in 2021.

Related Stories

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 3, 2011

Hardin Construction tops out Orlando Embassy Suites

The project began in April 2011 and is expected to open in fall 2012.

| Sep 30, 2011

Kilbourn joins Perkins Eastman

Kilbourn joins with more than 28 years of design and planning experience for communities, buildings, and interiors in hospitality, retail/mixed-use, corporate office, and healthcare.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021