flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SOM unveils renderings of dual-tower Manhattan West development

Mixed-Use

SOM unveils renderings of dual-tower Manhattan West development

The five million-sf project includes two office towers, a residential tower, retail space, and a new public square.


By David Malone, Associate Editor | January 25, 2016

Rendering: Millerhare

Skidmore, Owings & Merrill recently revealed new renderings of Manhattan West, its five million-sf project located next to the massive Hudson Yards development project, Dezeen reports.

Manhattan West will transform the New York skyline with two office towers and a slightly smaller residential tower. Thanks to the angled façade and rounded corners of the office buildings and the sharp, precise corners of the residential building, the trio looks like a crystal formation rising high into the New York City sky.

The taller of the two office buildings will stand 67 stories high, offer two million sf of space, and has its sights set on LEED Gold certification.

Meanwhile, the residential tower will stretch 62 stories into the sky and offer 844 apartment units. It will include such amenities as a regulation-sized basketball court, climbing wall, private kitchens and dining rooms for entertaining, and a rooftop terrace with grills.

 

Rendering: Millerhare

 
In addition to the three new towers, the project also calls for the re-cladding and renovation of an existing 1969 building originally designed by David Brody, and a new Central Plaza that will encompass two acres. REX architecture has designed a new glass façade for the building, and the plaza will include seating, landscaping, planned events, and 200,000 sf of retail, restaurants, and other amenities.
 

 Rendering: Millerhare

 

The 67-story office building is not the only part of the project hoping to be an example of sustainability, as the entire Manhattan West project anticipates LEED Gold certification. The Building Team hopes to achieve this through “enhanced energy efficiency, improved indoor air quality, high-performance glazing that maximizes daylight, rainwater collection, and regional sourcing for recycled materials,” according to the Manhattan West website.

The entire project is estimated to be valued at $8.6 billion after completion and stabilization. One Manhattan West, the 67-story tower, is currently under construction and scheduled to be completed in 2019. Two Manhattan West, the second office tower, will be constructed following the lease-up of the first tower. Three Manhattan West, the 62-story residential building, is currently under construction and plans on receiving its first residents in 2017 with a final completion date of 2018. The entire project is scheduled to be completed by 2020.

Brookfield Office Properties (developer) and James Corner Field Operations, the firm that was behind the High Line (landscape architect), are also on the team.

 

Rendering: Millerhare

Rendering: Atchain

Rendering: Atchain

Rendering: Millerhare

Related Stories

Mixed-Use | May 23, 2017

45-story tower planned for Miami Worldcenter

Pickard Chilton Architects will design the 600,000-sf 110 10th Street.

Mixed-Use | May 17, 2017

The Lincoln Common development has begun construction in Chicago’s Lincoln Park

The mixed-use project will provide new apartments, condos, a senior living facility, and retail space.

Reconstruction & Renovation | Apr 27, 2017

One of the last abandoned high-rises in Detroit’s downtown core moves one step closer to renovation

Kraemer Design has been selected as the architect of record and historic consultant on the Detroit Free Press building renovations.

Mixed-Use | Apr 25, 2017

Dutch building incorporates 22 emojis into its façade

The emoji building is part of a larger mixed-use development built around a 150-year-old oak tree.

Mixed-Use | Apr 24, 2017

Take a look at Brooklyn’s Domino Sugar Refinery redevelopment

The master plan features market-rate and affordable housing, mixed-use space, and a waterfront park with a 5-block long “Artifact Walk.”

Sports and Recreational Facilities | Apr 21, 2017

Boston Celtics training and practice facility will be part of Boston Landing mixed-use development

The facility will also include two floors of Class A laboratory and office space and retail space.

Mixed-Use | Apr 7, 2017

North Hollywood mixed-use development NoHo West begins construction

The development is expected to open in 2018.

Mixed-Use | Apr 5, 2017

SOM-designed ‘vertical village’ is Thailand’s largest private-sector development ever

60,000 people will live and work in One Bangkok when it is completed in 2025.

Urban Planning | Mar 31, 2017

4 important things to consider when designing streets for people, not just cars

For the most part what you see is streets that have been designed with the car in mind—at a large scale for a fast speed.

High-rise Construction | Mar 31, 2017

Ping An Finance Center officially becomes the fourth tallest building in the world

The completed building sits between the Makkah Royal Clock Tower at 1,972 feet and One World Trade Center at 1,776 feet.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021