flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

‘Stacked box’ skyscraper proposed for Vancouver

High-rise Construction

‘Stacked box’ skyscraper proposed for Vancouver

The scheme by German architect Ole Scheeren involves 48 stories with multiple volumes of rectangles protruding out of several floors toward different directions of the city.


By BD+C Staff | June 15, 2015
A ‘stacked box’ skyscraper proposed for Vancouver

Renderings courtesy Buro Ole Scheeren

German architect Ole Scheeren wants to add some drama to Vancouver’s skyline by designing a tower that Global News describes as a “Jenga-style skyscraper.”

The scheme involves 48 stories with multiple volumes of rectangles protruding out of several floors toward different directions of the city—a design that falls perfectly into a trend that architecture and design web magazine Dezeen noted last month after BIG unveiled its design for Two World Trade Center.

“I wanted to conceive of a tower that would address the city, open up to the city, and really engage the space of the city,” Scheeren told Global News. “Instead of siloing people in these extrusions, I basically took portions of the tower and folded them open horizontally, project them out into the space of the city and towards the landscape and with that find a very different way of engaging space.”

Scheeren, who’s practice Buro Ole Scheeren is based in Beijing and Hong Kong, was selected by developers Bosa Properties and Kingswood Properties. The two companies purchased the 1500 block on West Georgia Street, where the building is planned to erect.

Global News has the full report.

 

Related Stories

High-rise Construction | Sep 18, 2019

Central Park Tower tops out in New York City

The building will be the tallest residential skyscraper in the world.

AEC Innovators | Aug 27, 2019

7 AEC industry disruptors and their groundbreaking achievements

From building prefab factories in the sky to incubating the next generation of AEC tech startups, our 2019 class of AEC Innovators demonstrates that the industry is poised for a shakeup. Meet BD+C’s 2019 AEC Innovators.

Museums | Jul 29, 2019

A new museum debuts inside the Empire State Building

A $165 million, 10,000-sf museum opened on the second floor of the Empire State Building in New York City, completing the second of a four-phase “reimagining” of that building’s observatory experience, which draws four million visitors annually.

High-rise Construction | Jul 25, 2019

Could this 500 foot, Bjarke Ingels-designed observation tower rise in San Diego?

The tower would be part of the $2.4 billion Seaport San Diego project.

Building Tech | Jun 26, 2019

Modular construction can deliver projects 50% faster

Modular construction can deliver projects 20% to 50% faster than traditional methods and drastically reshape how buildings are delivered, according to a new report from McKinsey & Co.

High-rise Construction | Apr 11, 2019

Top new skyscrapers for 2019: Salesforce Tower named best worldwide

The San Francisco tower was recognized for its innovations in seismic engineering and a design that "gives back" to the community. 

High-rise Construction | Apr 10, 2019

*Updated* A Tulip is ready to bloom in London

Designed by Foster + Partners, the Tulip will rise 1,001 feet and be a new cultural and tourist attraction.

High-rise Construction | Mar 4, 2019

Goettsch Partners' tallest tower ever tops out in China

The tower will become the tallest in Nanning, China upon completion.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021