flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stadium renovation plans unveiled for Boston’s National Women’s Soccer League

Sports and Recreational Facilities

Stadium renovation plans unveiled for Boston’s National Women’s Soccer League

The plans include an addition of a mixed-use space with food and beverage offerings.


By Peter Fabris, Contributing Editor | October 24, 2024
Stadium renovation plans unveiled for Boston’s National Women’s Soccer League Courtesy Stantec
Courtesy Stantec

A city-owned 75-year-old stadium in Boston’s historic Franklin Park will be renovated for a new National Women’s Soccer League team. The park, designed by Fredrick Law Olmsted in the 1880s, is the home of White Stadium, which was built in 1949 and has since fallen into disrepair. Franklin Park is conveniently located near the Green Street and Forest Hills Orange Line stops and is easily accessible by walking and biking.

The renovation will add spaces, accessibility, systems, and amenities needed to be a citywide resource and will be used as an athletic facility for Boston schools’ athletic programs. The building team will take special care to preserve White Stadium’s art deco façade as well as Franklin Park’s heritage trees and pastoral paths. Improvements to White Stadium will include roof canopies over new grandstand seating areas that will hold 10,000 spectators and the addition of a mixed-use space with food and beverage offerings that opens out to the Playstead playing fields. Called “The Grove,” the event lawn will host events such as tai chi, children’s storytelling, small performances, seasonal markets, and cultural gatherings programmed with a neighborhood advisory group.

The West Grandstand and Grove will be renovated into 75,000 sf of team areas, concessions, and fan lounges, leased by the professional team and renovated/rebuilt for their needs. The East Grandstand and field will be demolished and rebuilt by the city to accommodate a 75-yard-wide regulation field and track. It will also focus on Boston Public Schools needs with student wellness areas, locker rooms, athletic equipment storage, and school department offices.

“This project is a visionary partnership between the City of Boston, the Boston Public Schools, and Boston Unity Soccer Partners to leverage the significant investment of a professional women’s soccer team to benefit generations of Boston public schoolchildren,” said Tamara Roy, principal, Stantec.

Construction is expected to be substantially completed by March 2026.

On the building team:
Owner and/or developer: Boston Unity Soccer Club LLC
Architect: Stantec
Stadium Design Consultant: Moody Nolan
MPFP Engineer: VAV International
Electrical Engineer: ART
Structural Engineer: WSP
General Contractor/Construction Manager: N/A

Related Stories

| Sep 30, 2011

Design your own floor program

Program allows users to choose from a variety of flooring and line accent colors to create unique floor designs to complement any athletic facility. 

| Sep 16, 2011

Largest solar installation completed at Redskins' football stadium

On game days, solar power can provide up to 20% of FedExField’s power.

| Sep 12, 2011

First phase of plan to revitalize Florida's Hialeah Park announced

This is the first project of a master plan developed to revive the historic racetrack. 

| May 25, 2011

Olympic site spurs green building movement in UK

London's environmentally friendly 2012 Olympic venues are fuelling a green building movement in Britain.

| Apr 11, 2011

Wind turbines to generate power for new UNT football stadium

The University of North Texas has received a $2 million grant from the State Energy Conservation Office to install three wind turbines that will feed the electrical grid and provide power to UNT’s new football stadium. 

| Apr 5, 2011

U.S. sports industry leads charge in meeting environmental challenges

The U.S. sports industry generates $414 billion annually. The amount of energy being consumed is not often thought of by fans when heading to the stadium or ballpark, but these stadiums, parks, and arenas use massive quantities of energy. Now sports leagues in North America are making a play to curb the waste and score environmental gains.

| Mar 25, 2011

Qatar World Cup may feature carbon-fiber ‘clouds’

Engineers at Qatar University’s Department of Mechanical and Industrial Engineering are busy developing what they believe could act as artificial “clouds,” man-made saucer-type structures suspended over a given soccer stadium, working to shield tens of thousands of spectators from suffocating summer temperatures that regularly top 115 degrees Fahrenheit.

| Mar 11, 2011

University of Oregon scores with new $227 million basketball arena

The University of Oregon’s Matthew Knight Arena opened January 13 with a men’s basketball game against USC where the Ducks beat the Trojans, 68-62. The $227 million arena, which replaces the school’s 84-year-old McArthur Court, has a seating bowl pitched at 36 degrees to replicate the close-to-the-action feel of the smaller arena it replaced, although this new one accommodates 12,364 fans.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021