Teeple Architects, in association with Stantec, has completed the $84.5-million, 230,000-sf renovation and expansion project of the existing Edmonton Public Library (EPL) main branch into an innovative and welcoming civic hub.
Now named the Stanley A. Milner Library, the facility originally opened as Edmonton’s Centennial Library in 1967. The renovation and expansion project actively supports the library’s position as a social and creative destination at its prominent downtown location on Sir Winston Churchill Square.
The original scope of the project included replacing the building’s exterior precast panels with a new energy efficient zinc building envelope with expanses of glazing, upgrading several aging building systems, activating the civic space around the building, and creating a new architectural identity to foster greater community engagement.
The public is invited inside the building via colored skylights, glazing panels, EPL signage, and a new plaza with clear views into the library’s programming, transforming the new library into a welcoming portal between Sir Winston Churchill Square and Centennial Square.
After collaboration with EPL and the City of Edmonton the project was expanded to include a comprehensive interior renovation. Visitors enter into a bright six-story atrium defined by a new “reading ramp” and a two-story interactive display wall. Basement lobby space for the the building’s theater and event rooms is now visible through voids in the floor.
New amenities spaces include large galleria spaces, a cafe, a multi-functional children’s library, maker spaces, a gaming space, a teaching kitchen, meeting spaces, administrative offices, and the PÎYÊSÎW WÂSKÂHIKAN (Thunderbird House), an Indigenous gathering and smudging space designed in consultation with local Cree Elders and their communities.
The Shelley Milner Children’s Library nearly triples the size of the original children’s area and hosts the Gwyn Morgan & Patricia Trottier Foundation Early Literacy Centre, the Brown Family Playspace, and the Al & Fran Olson Children’s Makerspace for ages 6-12.
The Makerspace on the second floor is for ages 12 and up and encompasses 10,000 sf. It comprises 3D printers, a heat press, a vinyl cutter, a sewing and serving center, a book binding area, a fully equipped Fab Lab with a laser cutter, a computer lab, a digital conversion services center, and recording studios.
The Stanley A. Milner Library Renewal project was completed in 2020.
Related Stories
| Aug 11, 2010
Community college’s hillside learning center
The Earl E. and Dorothy J. Dellinger Learning Resource Center at Southwest Virginia Community College in Richlands, Va., is the centerpiece of this mountainside school. Designed by Arlington, Va.-based The Lukmire Partnership, the 50,000-sf, two-story building connects the upper and lower campuses, which are separated by a 70-foot vertical grade change.
| Aug 11, 2010
BIG beats out Foster and Hadid in design competition for Kazakhstan's National Library
Invited as one of five pre-selected architect-led teams that included Lord Norman Foster and Zaha Hadid, Copenhagen-based BIG was awarded first prize in an international design competition for the new National Library in Astana, Kazakhstan. The 33,000-square-meter facility will be organized as a “circular loop of knowledge” that allows for clear, intuitive orientation of the vast co...
| Aug 11, 2010
Modest recession for education construction
Construction spending for education expanded modestly but steadily through March, while at the same time growth for other institutional construction had stalled earlier in 2009. Education spending is now at or near the peak for this building cycle. The value of education starts is off 9% year-to-date compared to 2008.
| Aug 11, 2010
Concrete Solutions
About five or six years ago, officials at the University of California at Berkeley came to the conclusion that they needed to build a proper home for the university's collection of 900,000 rare Chinese, Japanese, and Korean books and materials. East Asian studies is an important curriculum at Berkeley, with more than 70 scholars teaching some 200 courses devoted to the topic, and Berkeley's pro...
Cultural Facilities | Aug 11, 2010
12 major trends in library design
Many academic planners assumed that the coming of the Internet would lead to the decline of the library as we know it. To the contrary, many academic libraries have experienced significantly increased patron use in recent years.
| Aug 11, 2010
Giants 300 University Report
University construction spending is 13% higher than a year ago—mostly for residence halls and infrastructure on public campuses—and is expected to slip less than 5% over the next two years. However, the value of starts dropped about 10% in recent months and will not return to the 2007–08 peak for about two years.
| Aug 11, 2010
Let There Be Daylight
The new public library in Champaign, Ill., is drawing 2,100 patrons a day, up from 1,600 in 2007. The 122,600-sf facility, which opened in January 2008, certainly benefits from amenities that the old 40,000-sf library didn't have—electronic check-in and check-out, new computers, an onsite coffeehouse.
| Aug 11, 2010
Fleet Library, Rhode Island School of Design
When tasked with transforming an early 1920s Italian Renaissance bank building into a fully functional library for the Rhode Island School of Design, the Building Team for RISD's Fleet Library found itself at odds with the project's two main goals. On the one hand, the team would have to carefully restore and preserve the historic charm and ornate architectural details of the landmark space, d...