The Dallas-based tech startup Rollout noticed just how paper-dependent AEC firms are.
The company says that 90% of contractors still use paper plans, and that 37 million construction drawings are printed every year. These outdated drawings end up costing these firms $9 billion per year.
Rollout developed PaperLight, an interactive projector and screen that provides the benefits of paper, but without the waste.
Users assemble PaperLight with the 34x24-inch white screen flat on a surface and the 29-inch projection rod hovering above it. It works as a touchscreen, where users can not only view plans, but also sketch, zoom in and out, and write notes with a stylus or their fingers. PaperLight captures edits automatically and can connect with a computer.
It fits on most desktops, and the projector can even be angled upwards and shined onto a wall for presentations. PaperLight works with a bunch of programs, including Photoshop, Autodesk AutoCAD, SketchUp, and Revit. The device is made of plastic, not glass, and it is shatterproof, water-resistant, and portable. It weighs 20 lbs.
Rollout will begin a crowdfunding campaign on SPURstartup later this week. PaperLight has a retail price of $5,000 and a pre-order price of $3,999 while supplies last.
Related Stories
AEC Tech | Mar 10, 2016
Is the Internet of Things the key to smarter buildings and cities?
Experts say yes. But what’s needed is a point person who makes sure that sensing devices can “talk” to each other.
Multifamily Housing | Mar 10, 2016
Access and energy control app clicks with student housing developers and managers
Ease of installation is one of StratIS’s selling features.
AEC Tech | Mar 8, 2016
WiredScore offers developers competitive advantage in marketing
Designates best-in-class Internet connectivity.
Game Changers | Feb 5, 2016
London’s ’shadowless’ towers
Using advanced design computation, a design team demonstrates how to ‘erase’ a building’s shadows.
Game Changers | Feb 5, 2016
Asia’s modular miracle
A prefab construction company in China built a 57-story tower in 19 days. Here’s how they did it.
Game Changers | Feb 5, 2016
Tesla: Battery storage is not just about electric vehicles
With his $5 billion, 13.6 million-sf Gigafactory, Tesla’s Elon Musk seeks to change the economics of battery energy storage, forever.
BIM and Information Technology | Jan 27, 2016
Seeing double: Dassault Systèmes creating Virtual Singapore that mirrors the real world
The virtual city will be used to help predict the outcomes of and possible issues with various scenarios.
3D Printing | Jan 25, 2016
Architecture students create new method for 3D printing concrete
The team's Fossilized project allows for structures that are more varied and volumetric than other forms so far achieved.