The Washington, DC office of Perkins Eastman joined the students, faculty, staff, and community of Stoddert Elementary School; the Department of General Services; and DC Public Schools in celebrating the school’s recognition for environmental sustainability with a first-ever US Department of Education Green Ribbon School award. Stoddert is one of 78 schools spanning 29 states to receive the recognition.
Designed as both a high performance, healthy, and sustainable environment and as a teaching tool, Stoddert Elementary School and Community Center enhances learning and inspires environmental stewardship, as well as serving as an inspiration for the entire community. The school, certified LEED for Schools Gold, enhances learning by optimizing acoustics, enhancing indoor air quality, providing for thermal control/comfort, providing pervasive natural light, and by actively engaging the students and community in understanding how the design conserves resources. Stoddert is first school in the District of Columbia to be fully served by a ground source heating and cooling (geothermal) system.
An interactive kiosk with content also available online, enables Stoddert’s students to analyze the building’s use of energy, water, and other resources. A student-led Energy Patrol guides tours of the building empowering students to teach what they have learned. +
Related Stories
| Mar 19, 2012
Smith Carter joins forces with Genivar
Smith Carter has a workforce of some 190 employees and designs complex buildings in challenging environments.
| Mar 19, 2012
HKS Selected for Baylor Medical Center at Waxahachie
Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records.
| Mar 19, 2012
Mixed-use project redefines Midtown District in Plantation, Fla.
Stiles Construction is building the residential complex, which is one of Broward County’s first multifamily rental communities designed to achieve LEED certification from the USGBC.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.
| Mar 16, 2012
Work on Oxnard, Calif. shopping center resumes after a three-year hiatus
Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall.
| Mar 16, 2012
Stego embarks on HPD Pilot Program
Vapor barrier manufacturer strives to provide better green choices to designers and builders.
| Mar 16, 2012
Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge
Architects in U.S. and abroad offered the chance to showcase their very best work.
| Mar 14, 2012
Hearing to decide fate of unfinished Harmon in Las Vegas under way
The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.
| Mar 14, 2012
Firestone names 2012 Master Contractor Award Winners
Annual award acknowledges industry’s top roofing professionals.