The Washington, DC office of Perkins Eastman joined the students, faculty, staff, and community of Stoddert Elementary School; the Department of General Services; and DC Public Schools in celebrating the school’s recognition for environmental sustainability with a first-ever US Department of Education Green Ribbon School award. Stoddert is one of 78 schools spanning 29 states to receive the recognition.
Designed as both a high performance, healthy, and sustainable environment and as a teaching tool, Stoddert Elementary School and Community Center enhances learning and inspires environmental stewardship, as well as serving as an inspiration for the entire community. The school, certified LEED for Schools Gold, enhances learning by optimizing acoustics, enhancing indoor air quality, providing for thermal control/comfort, providing pervasive natural light, and by actively engaging the students and community in understanding how the design conserves resources. Stoddert is first school in the District of Columbia to be fully served by a ground source heating and cooling (geothermal) system.
An interactive kiosk with content also available online, enables Stoddert’s students to analyze the building’s use of energy, water, and other resources. A student-led Energy Patrol guides tours of the building empowering students to teach what they have learned. +
Related Stories
| Mar 1, 2012
8 tips for architects to consider before LED installation
Lighting experts offer Building Team members critical information to consider before upgrading lighting systems to LEDs.
| Mar 1, 2012
Reconstruction Awards: Reinvesting in a neighborhood’s future
The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.
| Mar 1, 2012
7 keys to ‘Highest value, lowest cost’ for healthcare construction
The healthcare design and construction picture has been muddied by uncertainty over the new healthcare law. Hospital systems are in a bind, not knowing what levels of reimbursement to expect. Building Teams serving this sector will have to work even harder to meet growing client demands.
| Mar 1, 2012
Cornell shortlists six architectural firms for first building on tech campus
Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.
| Mar 1, 2012
Aragon Construction completes 67,000-sf build-out in NYC
Aragon constructed the space in partnership with Milo Kleinberg Design Associates, (MKDA) and the Craven Corp. as the owner’s representative.
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Mar 1, 2012
Eidco Construction bolsters Chicago office
Eldco hires Peterson and Vivoda as senior project managers.
| Mar 1, 2012
Reconstruction of L.A.’s Dunbar Hotel underway
Withee Malcolm Architects’ designs for the project include the complete renovation of the Dunbar Hotel and the Somerville Apartments I and II.
| Feb 29, 2012
C.W. Driver opens new office, appoints Castillo regional SVP
Castillo will oversee projects with new and existing clients in northern California within the areas of education, healthcare/biomedical, public sector, military contracting, entertainment, retail, corporate and hospitality.
| Feb 29, 2012
Report says BIPV glass market to reach $6.4 billion by 2016
The report analyzes the opportunities for BIPV glass products using c-Si, thin-film and OPV/DSC materials and provides eight-year forecasts in terms of MW and square footage shipped as well as forecasts of revenue generated.