flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Mar 27, 2017

Bills in Maryland Legislature would restrict use of wood in multifamily construction

American Wood Council and design and construction professionals are speaking out against the measure.

Codes and Standards | Mar 23, 2017

New manual of IT connectivity guidelines for commercial developments, redevelopments released

Mobile capacity planning, conduit points of entry, and electrical resiliency are covered.

Codes and Standards | Mar 22, 2017

Brick Industry Assn. study finds brick buildings cost less than precast, metal, and glass

The study compares costs in five categories of construction.

Codes and Standards | Mar 21, 2017

Calif. shopping center is first to earn BREEAM USA In-Use certification

The certification measures and monitors environmental performance of existing buildings.

Codes and Standards | Mar 20, 2017

Professional liability insurance rates for architects and engineers expected to be stable in 2017

Premiums leveled off in 2015, and claims have been stable, helping to hold costs down.

Codes and Standards | Mar 15, 2017

Energy Star program at risk

The standard-setting initiative for energy-efficient products may be a victim of Trump budget cuts.

Codes and Standards | Mar 13, 2017

U.S. House and Senate have voted to repeal Dept. of Labor’s 'blacklisting' rule

The rule mandates labor compliance review for federal construction contractors.

Codes and Standards | Mar 9, 2017

WiredScore forms Connectivity Advisory Committee

The committee's creation is an important step forward for the group that evaluates internet connectivity in buildings.

Codes and Standards | Mar 8, 2017

New guide examines multifamily high-performance ventilation

The focus is on cost and performance of various systems.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021