flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | May 18, 2017

AIA releases updated edition of its A201 flagship documents

These core documents are updated once a decade.

Codes and Standards | May 16, 2017

Trump’s proposed corporate tax rate changes said to stifle funding for affordable housing

Banks reluctant to commit to specific deals with tax credit status uncertain.

Codes and Standards | May 15, 2017

New IoT-Ready Alliance to establish standard for IoT sensors in LED light fixtures

It aims to make installation of technology easier.

Codes and Standards | May 10, 2017

OSHA increases penalties on South Dakota contractor after fatal building collapse

Agency issues over $300,000 in fines for ‘willful’ safety violations.

Codes and Standards | May 9, 2017

Potential shade on Boston Common from proposed high-rise raises public ire

The Mayor is among those who want to change 1990s anti-shadow law.

Codes and Standards | May 9, 2017

Method of estimating amount of CO2 by building occupants may be inaccurate

New research suggests current estimates may be off by as much as 25%.

Codes and Standards | May 8, 2017

National Fenestration Rating Council’s new U-factor standard open for public comment

Member-approved ballot change to NFRC 100 comments to close on May 28.

Codes and Standards | May 4, 2017

Millennials’ views on sustainability could influence the workplace

Nine out of ten say it is important that they work for a company committed to sustainability.

Codes and Standards | May 3, 2017

New York State extends design-build authority

The legislation includes eight additional projects.

Codes and Standards | May 2, 2017

U.S. announces preliminary tariffs on Canadian softwood lumber

The rates range from 3% to 24% per producer.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021