flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Jul 27, 2017

Five fire scenarios tested on full-scale mass timber building

Results will help inform code changes.

Codes and Standards | Jul 26, 2017

New ISO standard on video fire detectors will help identify fires more quickly

The standard marks the first comprehensive international specification for this equipment.

Codes and Standards | Jul 25, 2017

Geotechnical solutions prevent building distress due to expansive clay soils

The condition is the most common geologic hazard in the U.S.

Codes and Standards | Jul 24, 2017

Non-union labor gaining ground in New York City

President of contractors’ group says competitive pricing is spurring more open shops.

Codes and Standards | Jul 20, 2017

New tallest tower west of the Mississippi built to stringent seismic standards

L.A.’s new 1,100-foot skyscraper dominates city’s skyline.

Codes and Standards | Jul 19, 2017

Economic impacts of climate change will jump over next two decades

Average annual cost to buildings and infrastructure from eastern storms to rise by $7.3 billion.

Codes and Standards | Jul 18, 2017

Energy modeling yields accuracy within 4%, says new study

Results of the study support the usefulness of the practice.

Codes and Standards | Jul 13, 2017

Net Zero Energy rebranded as ‘Zero Energy’

ILF aims to make new certification the sole standard for highest performing buildings.

Codes and Standards | Jul 13, 2017

New York City creates $10 million fund to help women- and minority-owned firms win construction contracts

The money is earmarked for up to $500,000 surety bonds per contract.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021