flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Oct 11, 2017

Data, transparency are keys to next steps in green building, says USGBC chief

Monitoring and comparing performance are critical to advancing sustainability goals.

Codes and Standards | Oct 10, 2017

New guidelines for quality control on application of membrane roof systems released

NRCA document provides guidance for on-site evaluation.

Codes and Standards | Oct 9, 2017

New app calculates maximum allowable heights for building occupancy types, classes of construction

The app streamlines compliance on various types of construction.

Codes and Standards | Oct 5, 2017

California lawmakers pass bill that requires GCs to pay wages of sub employees if subs fail to pay

The measure will go into effect in January if the governor signs it.

Codes and Standards | Oct 4, 2017

Ambitious but realistic increase in clean energy would cut GHG emissions by 80% in the U.S.

NRDC report says goal can be achieved with existing tools.

Codes and Standards | Oct 3, 2017

Reducing duct leakage is focus on latest green building standards updates

ASHRAE 189.1 broadens testing requirements to include more types of ducts.

Codes and Standards | Oct 2, 2017

Nationwide retrofit strategy in Canada could cut 51% of emissions from large buildings

The roadmap provides government and industry with a targeted plan.

Codes and Standards | Sep 28, 2017

Resources available for new OSHA respirable crystalline silica regulation

NRCA offers compliance tools for contractors.

Codes and Standards | Sep 28, 2017

New tool compares HVAC system efficiency

IAPMO and Hydronics Industry Alliance unveil BEST to evaluate systems in early design phase.

Codes and Standards | Sep 26, 2017

Anti-drone technology can ward off unauthorized drone flights

The technology can be used to prevent terrorist attacks and spying.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021