flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Dec 4, 2017

Trump tax proposal would kill historic tax credits

Developers would lose up to 20% discounts on some redevelopment projects.

Codes and Standards | Nov 30, 2017

Asheville, N.C. rezoning favors pedestrians, could change city’s character

Focus is on layout and look of new buildings rather than use.

Codes and Standards | Nov 29, 2017

Many New York City landlords have not addressed new flood codes

City revised building codes after Superstorm Sandy, but many owners not required to upgrade.

Codes and Standards | Nov 28, 2017

Nail-Laminated timber Canadian design and construction guide released

Includes practical strategies and guidance with lessons from real-life projects.

Codes and Standards | Nov 27, 2017

New standard to monitor building sealing performance

Increased understanding of how materials act when stretched and compressed is the goal.

Codes and Standards | Nov 27, 2017

Denver voters approve green roof mandate

Buildings of 25,000 sf or larger required to install vegetative roof or PVs.

Codes and Standards | Nov 21, 2017

USGBC adopts ‘RELi’ resilient building and design standard

The standard prescribes methods for designing more resilient buildings and communities.

Codes and Standards | Nov 21, 2017

Updated material transparency web site and hazardous building materials list unveiled

Improved versions of tools aimed at use of healthier construction supplies.

Codes and Standards | Nov 16, 2017

White roofing isn’t always the best choice

Adverse effects include heat reflection onto nearby walls.

Codes and Standards | Nov 15, 2017

U.S. finalizes tariffs on Canadian softwood lumber

The duties would add 20% or more to cost if trade negotiators can’t find common ground.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021