flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Jan 30, 2020

Dramatic demographic shifts poised to alter global workplace

By 2030, Millennials and Generation Z will dominate workforce.

Codes and Standards | Jan 29, 2020

Half of Manhattan’s new residential skyscrapers are empty

Excess comes as middle class housing shortage worsens.

Codes and Standards | Jan 28, 2020

Updated Engineered Wood Construction Guide now available

Provides guidance on building engineered wood floors, walls, and roofs.

Codes and Standards | Jan 24, 2020

Fenestration Rating Council earns ANSI certification

FenStar Certification Program ensures windows, doors, and skylights meet Energy Star specifications.

Codes and Standards | Jan 23, 2020

Rent control policies backfire on goal of boosting affordable housing

Natl. Apartment Assn. study says rent control decreases housing supply, harms condition of housing stock.

Codes and Standards | Jan 22, 2020

Potential energy savings from smart meters is largely unrealized

Most utilities underuse the technology that can help customers save money.

Codes and Standards | Jan 21, 2020

Contractors pay practices reviewed in new database

Fastest and slowest paying GCs revealed.

Codes and Standards | Jan 17, 2020

Several states with ambitious climate goals will have to restrict natural gas as a fuel

Buildings would have to heat and cook with electricity.

Codes and Standards | Jan 16, 2020

New solar-ready mandate affects commercial and residential buildings in St. Louis

All new buildings must have reserved rooftop sections for PVs.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021