flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Apr 23, 2020

COVID-19 epidemic demonstrates value of flexible hospital space

Some rooms being repurposed for ICU care.

Codes and Standards | Apr 15, 2020

Embodied carbon footprint can be reduced by using conventional materials

High-SCM concrete, and cellulose and wood fiber insulation among the greener alternatives.

Coronavirus | Apr 13, 2020

COVID-19 alert: City conducts a 'virtual building inspection' to allow Starbucks and bank to open

Bothell, Wash., issues a certificate of occupancy to developer after inspecting the property online. 

Codes and Standards | Apr 13, 2020

Design competition focuses on reducing urban heat island effect

Cool Abu Dhabi aims to transform urban life in the Middle East.

Codes and Standards | Apr 13, 2020

What building science says about reducing COVID-19 transmission

Impact of temperature and relative humidity is unclear.

Codes and Standards | Apr 9, 2020

Owners retrofitting properties, monitoring performance during epidemic

Covid-19 outbreak may lead employers to reevaluate office commitments.

Codes and Standards | Apr 7, 2020

Dept. of Labor publishes guidance on paid sick leave, expanded family and medical leave

Includes fact sheets for employees, employers, and a questions and answers document.

Codes and Standards | Apr 1, 2020

Standards and codes meetings halted, postponed

ASTM International cancels in-person standards meetings; DOE’s National Energy Codes Conference postponed.

Codes and Standards | Mar 26, 2020

Ransomware attack on Canadian contractor underscores need for cybersecurity

Victimized company Bird Construction has defense, law enforcement contracts.

Codes and Standards | Mar 23, 2020

Contractors should scrutinize contracts carefully amid Covid-19 crisis

Compliance with time-sensitive notice requirements and careful documentation required.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021