flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Jun 8, 2020

5 must reads for the AEC industry today: June 8, 2020

Frank Lloyd Wright sites set to reopen and construction jobs rise by 464,000.

Codes and Standards | Jun 8, 2020

Reopened offices raise liability risk for businesses and owners

Risks may not be covered by property insurance.

Codes and Standards | Jun 4, 2020

American Wood Council updates report on fire resistance of wood members and assemblies

Provides new examples and background on mass timber calculations.

Codes and Standards | Jun 3, 2020

Virginia makes GCs liable for subs employee wages

New law allows workers to sue GCs for wages in class action.

Codes and Standards | Jun 2, 2020

Designers, owners reinventing restaurants to cope with COVID-19

Options include rearranged seating, mobile ordering, designated flow spaces.

Codes and Standards | Jun 1, 2020

How owners should comply with OSHA roofing safety guidelines

Buildings should have fall protection and restraint provisions for those who go on roofs.

Codes and Standards | May 29, 2020

AIA releases new, updated sustainable project documents

Streamlined sustainable design and construction process included.

Codes and Standards | May 28, 2020

USGBC outlines how it will support pandemic recovery efforts

Includes emergency guidance and upgrades to the LEED green building program.

Codes and Standards | May 27, 2020

Office market could be COVID-19 casualty

As companies get used to work at home, post-pandemic office market could collapse.

Codes and Standards | May 26, 2020

Architectural Reuse Council will step up efforts to reuse construction waste

Cabinets, appliances, lighting, and lumber diverted from landfills to be repurposed.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021