flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Sweden’s tallest timber building is open for business

Wood

Sweden’s tallest timber building is open for business

C.F. Møller Architects designed the building.


By David Malone, Associate Editor | March 5, 2019
Kajstaden exterior at night

Photo: Nikolaj Jakobsen

Made of solid timber and situated about an hour from Stockholm in the Kajstaden district of Västerås, a recently completed multifamily development has become the tallest timber building Sweden. The walls, beams, balconies, elevators, and stairwells are all made from cross-laminated timber.

Rising 8.5 stories and spanning 7,500 sm, the Kajstaden project features four apartments on each level. Each floor took three craftsmen an average of three days to build. The project uses mechanical joints and screws, which means, if necessary, the building can be taken apart at a later date and the materials reused.

 

Unfinished interior room in mass timber buildingCourtesy C.F. Møller Architects.

See Also: Gensler designs Texas’ first full mass timber building

 

It is estimated that a building made of solid wood instead of concrete will have a total carbon dioxide savings of 550 tons of CO2 over the building’s life. Use of CNC-milled solid timber and glulam provides an airtight, energy-efficient building without adding other materials to the walls. The low weight of timber also means fewer deliveries to the construction site.

The building was developed in collaboration with Martinsons, Bjerking, and Consto AB, with Slättö Förvaltning as the client.

 

Kajstaden before completionCourtesy C.F. Møller Architects.

Tags

Related Stories

Office Buildings | Jul 19, 2017

James Corner Field Operations, designers of the High Line, creates rooftop amenity spaces for three Dumbo office buildings

The new spaces range from about 8,500 to 11,000 sf and were added to Two Trees Management’s anchor office buildings.

Reconstruction & Renovation | Jul 18, 2017

Mortenson Construction incorporates 100-year-old barn into new Portland office space

Mortenson deconstructed the barn and repurposed it for the new space.

Codes and Standards | Jul 10, 2017

New mass plywood panel project moves ahead with federal grant

New material is substitute for concrete and steel in multi-story projects.

Wood | Jul 10, 2017

University of Idaho Arena plans to make timber a focal point

The project received a Wood Innovation Grant that will help spur construction of the Hastings + Chivetta-designed project.

Wood | Jun 13, 2017

The first timber high-rise in the U.S. set for construction in Portland

The building’s design, building materials, and commercial tenants are all focused on the key aspect of sustainability.

| Jun 13, 2017

Accelerate Live! talk: Next-gen materials for the built environment, Blaine Brownell, Transmaterial

Architect and materials guru Blaine Brownell reveals emerging trends and applications that are transforming the technological capacity, environmental performance, and design potential of architecture.

Wood | Jun 6, 2017

Shigeru Ban-designed residential structure poised to become world’s tallest hybrid timber building

The wood, concrete, and glass building will rise approximately 233 feet when finished.

| Jun 5, 2017

Fire-rated frames deliver the natural look of wood

The TimberLine Series pairs a high-strength steel subframe with a wood-veneered metal cover cap to produce a slender fire-rated frame.

Multifamily Housing | May 17, 2017

Swedish Tower’s 15th floor is reserved for a panoramic garden

C.F. Møller’s design was selected as the winner of a competition organized by Riksbyggen in Västerås.

Sponsored | Ceilings | Apr 4, 2017

Wood ceilings and walls help convey energy of college football

Real wood veneer panels evoke warmth, texture, and color of a football.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021