flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tahanan supportive housing development brings 145 apartments to San Francisco

Multifamily Housing

Tahanan supportive housing development brings 145 apartments to San Francisco

David Baker Architects designed the project.


By David Malone, Associate Editor | February 2, 2021
Tahanan exterior

All renderings courtesy David Baker Architects

A new modular supportive housing development is currently under construction in San Francisco’s central SOMA District.

Tahanan will offer 145 studio apartments (and one manager’s unit) of permanent housing and services for adults who have experienced homelessness. A poured-in-place concrete podium comprises common areas, a counseling suite, administrative offices, and retail space. The upper five floors of wood-frame construction consist of the modular boxes, with each one containing two apartment units and a corridor. The modules were constructed offsite by Factory OS.

 

Tahanan rear

 

The six-story building is being built via modular construction on a site in the central South of Market neighborhood and is part of the SOMA Filipina’s Cultural District, which was established by the S.F. Board of Supervisors and Planning Department to preserve the cultural diversity of the area with attention to highlighting the culture and contributions of the Filipinx American Community.

 

Tahanan facade

 

This culture is referenced in the building’s name and look. Tahanan is a Tagalog word that evokes the idea of “coming home” or “return home,” while the pattern in the cast concrete is made with traditional handwoven banig mats. Additionally, a mega-graphic of Philippine rice terraces is integrated into the exterior metal skin.

A combined enterprise of Mercy Housing, Tipping Point Community, and the San Francisco Housing Accelerator Fund, this project has been developed in collaboration with S.F.’s Department of Homelessness & Supportive Housing. The project has been under construction since October 2020 and is slated for completion in August 2021.

 

Tahanan entrance

 

Tahanan unit

Related Stories

Sponsored | | Nov 15, 2021

How TDK Construction Saves Time and Money with EXACOR™ MgO Panels: Getting in on the Ground Level

Smart decisions made at the start of multifamily design-builds can improve efficiency on the job site, keeping projects on-time and on-budget, so you can make your properties profitable sooner. TDK Construction did just that on a recent luxury apartment project in Tennessee.

Multifamily Housing | Nov 14, 2021

How to build better parking for multifamily housing projects

In designing and building multifamily projects, parking determines everything from site suitability to the building’s footprint to revenue optimization.

Multifamily Housing | Nov 9, 2021

MAD Architects unveils One River North design

The project is set to rise in Denver.

Hotel Facilities | Nov 3, 2021

California’s Hotel del Coronado is finishing up the final piece to its Master Plan

A 75-residence Shore House will be family oriented and meeting commodious.

Multifamily Housing | Nov 3, 2021

Courthouse becomes mixed-income housing development

The project is located in Worcester, Mass.

Adaptive Reuse | Nov 1, 2021

CallisonRTKL explores converting decommissioned cruise ships for housing

The rapid increase in cruise ship decommissioning during the last 18 months has created a unique opportunity to innovate and adapt these large ships.

Multifamily Housing | Oct 31, 2021

Developer chooses ductless HVAC system for the Lofts at Empire Yards

Georgia developer chooses ductless systems for their performance, quiet operation, and efficiency 'in a nice, sleek package.'

Multifamily Housing | Oct 31, 2021

Propane tankless water heaters conserve water and energy

Propane tankless water heaters offer efficient, on-demand hot water for multifamily buildings.

Cladding and Facade Systems | Oct 26, 2021

14 projects recognized by DOE for high-performance building envelope design

The inaugural class of DOE’s Better Buildings Building Envelope Campaign includes a medical office building that uses hybrid vacuum-insulated glass and a net-zero concrete-and-timber community center.

Multifamily Housing | Oct 22, 2021

A plan to solve California's housing crisis

A framework for workforce housing, environmental repair and economic balance.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021