flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tennessee Tech University’s new recreation and fitness center opens

University Buildings

Tennessee Tech University’s new recreation and fitness center opens

Wold | HFR Design designed the project.


By David Malone, Associate Editor | April 15, 2021
Tennessee Tech University Marc L. Burnett Student Recreation & Fitness Center aerial

Photos: Wold | HFR Design

The Marc L. Burnett Student Recreation & Fitness Center has officially opened on Tennessee Tech University’s campus. 

The new facility, designed by Wold | HFR Design, is twice the size of the 1991 facility it replaces and provides a new focal point at the campus entrance. The design and materials reflect a contemporary interpretation of the Georgian style architecture prevalent on campus.

 

Tennessee Tech University rec and fitness center

 

The three-story, 165,000-sf recreation and fitness facility includes a basketball gym and multi-activity court, a racquetball courts, retractable bleachers for spectators, a 13,000-sf weight room, a 6,000-sf cardio room, a climbing wall, a golf simulator, an elevated track, an aquatic center, a dance studio, a game room, and a wellness and nutrition area. Additionally, an expanded childcare space, offices, and large group exercise areas are included.

Basketball and pickleball courts are included outside and an outdoor pursuits component allows student to rent equipment such as kayaks and camping gear. The facility was completed in August 2020 but the grand opening was postponed until April 2021 due to the COVID-19 pandemic.

Related Stories

University Buildings | Sep 28, 2021

Designing for health sciences education: Specialty instruction and human anatomy labs

It is a careful balance within any educational facility to provide both multidisciplinary, multiuse spaces and special-use spaces that serve particular functions.

University Buildings | Sep 7, 2021

Gateway to the West: Kansas City University Center for Medical Education Innovation

Kansas City University Center for Medical Education Innovation uses GKD Omega 1520 metal fabric.

Laboratories | Aug 31, 2021

Pandemic puts science and technology facilities at center stage

Expanding demand for labs and life science space is spurring new construction and improvements in existing buildings.

Giants 400 | Aug 30, 2021

2021 Giants 400 Report: Ranking the largest architecture, engineering, and construction firms in the U.S.

The 2021 Giants 400 Report includes more than 130 rankings across 25 building sectors and specialty categories.

Giants 400 | Aug 26, 2021

2021 University Giants: Top architecture, engineering, and construction firms in the higher education sector

Gensler, AECOM, Turner Construction, and CannonDesign head BD+C's rankings of the nation's largest university sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.

University Buildings | Aug 19, 2021

School of Medicine completes on California University of Science and Medicine’s new Colton campus

The project was designed and built to address critical public health needs in an underserved region.

Resiliency | Aug 19, 2021

White paper outlines cost-effective flood protection approaches for building owners

A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.

University Buildings | Aug 12, 2021

Central Michigan University’s Chippewa Champions Center completes

The project was designed in partnership between Populous and GMB Architecture + Engineering.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021