flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Three AEC firms launch a mass timber product for quicker school construction

Wood

Three AEC firms launch a mass timber product for quicker school construction

TimberQuest brand seeks to avoid overinvestment in production that has plagued other CLT providers.


By John Caulfield, Senior Editor | June 10, 2021
Exterior rendering of mass-timber TimberQuest school building

TimberQuest, which uses prefabricated mass timber components, can significantly reduce a project's design and construction periods. Images: Courtesy of XL Construction

The website expertmarketresearch.com estimates that the value of the global cross-laminated timber market hit $779 million in 2020, and is expected to grow annually by 13% to $1.624 billion in 2026.

As demand for mass timber increases, branding is beginning to emerge. One example is TimberQuest, an advanced prefabricated school construction product for the California educational market, which was recently launched by three Bay Area AEC firms: Milpitas-based XL Construction, San Jose-based Aedis Architects, and Saratoga-based Daedalus Structural Engineering.

The trio’s first project using its product is a new 4,000-sf building for kindergarten students with four 1,000-sf classrooms, each with its own restroom, for Sacred Heart Schools in Atherton, Calif., whose 63-acre campus and K-12 curriculum serve more than 800 families. The school greenlighted this project—which is believed to be the first of its kind in the nation—on April 1, and the mass timber components were fabricated and delivered to the construction site by June 1. The building team is targeting an August 31 completion date, in time for the fall semester.

“Two of the things we liked most about the TimberQuest classroom design is the ‘daylighting’ created by the structure’s large windows combined with the exposed wood interior that makes the classroom very pleasant and appealing,” says Michael Dwyer, Sacred Heart Schools’ director of operations. “The building’s overall energy efficiency supports our sustainability philosophy and stands as a shining example of these values we teach to our students.”

Also see: A fly-through video rendering of a TimberQuest classroom

 

A FLEXIBLE PRODUCTION APPROACH TO MASS TIMBER CONSTRUCTION

Interior rendering of TimberQuest classroom
TimberQuest buildings are available in three-to-nine classroom sizes, and are designed to let in lots of natural light.

 

Matt Larson, XL Construction’s preconstruction director, tells BD+C that his firm and Aedis had worked together previously. “We also knew that we needed a structural expert on both mass timber and California codes. Daedalus [has] local expertise, and has partnered with Fast + Epp, a leading expert on mass timber, to provide both expertise under one roof. XL, Aedis and Daedalus have a core commitment to sustainability and innovation, which are at the heart of TimberQuest.”

Larson went on to explain TimberQuest’s approach to fabrication. For higher-tech items that require expensive machining (such as the mass timber components, the HVAC system, and the glazing system), the building team partners with local suppliers with existing plants. For lower-tech parts of panel fabrication, “there is no requirement for a large plant or expensive tooling,” says Larson. To fabricate walls and roofs, flexible approaches can include “popup” factories in temporary facilities, and using XL’s shop/yard. Fabricating onsite is also an option.

“We feel that this approach will help us avoid a common failure point for this type of venture, namely the overinvestment in facilities and tooling and lack of ability to quickly scale up or down,” says Larson.

 

FEWER DESIGN DAYS AND ONSITE TRADES

Several factors contribute to TimberQuest’s production speed. These include pre-made design for manufacturing and assembly, and the reduction in the number of trades needed for a project. Larson says that the building team has winnowed the design process—normally 6-12 months—to 6-8 weeks; and has cut the number of trades onsite—typically between 20 and 30—to around 10. “And we hope to reduce it further in the future,” he says.

TimberQuest buildings are available in three- to nine-classroom sizes, between 3,000 and 9,000 sf. A total of nine interior layouts are included in the precheck design, including standard classroom, large classroom, breakout space, office/conference, science, kindergarten and three restroom configurations. The all-electric design utilizes heat pump technology to exceed California’s Title 24 energy usage standards by between 35% and 60%. TimberQuest buildings seek to take full advantage of renewable energy resources.

Related Stories

| Aug 11, 2010

New data shows low construction prices may soon be coming to an end

New federal data released recently shows sharp increases in the prices of key construction materials like diesel, copper and brass mill shapes likely foreshadow future increases in construction costs, the Associated General Contractors of America said. The new November producer price index (PPI) report from the Bureau of Labor Statistics provide the strongest indication yet that construction prices are heading up, the association noted.

| Aug 11, 2010

LEED 2009 cites FloorScore Certification as indicator of indoor air quality

The U.S. Green Building Council (USGBC) has cited FloorScore® certified flooring products as eligible for credits under the new LEED 2009 Version 3 guidelines. Reflecting the inclusion of FloorScore, the new LEED IEQ Credit 4.3 for Low-Emitting Materials has been expanded from “Carpet Systems” to “Flooring Systems” to include hard surface flooring.

| Aug 11, 2010

Southern Pine Council releases certification survey results

Recent surveys conducted by the Southern Forest Products Association (SFPA) and Random Lengths assessed the use of forest certification programs in the wood products industry and uncovered interesting results, including the fact that approximately 61% do not use a certification system and that about 60% of southern pine producers receive regular requests for certified products.

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

| Aug 11, 2010

AAMA leads development of BIM standard for fenestration products

The American Architectural Manufacturers Association’s newly formed BIM Task Group met during the AAMA National Fall Conference to discuss the need for an BIM standard for nonresidential fenestration products.

| Aug 11, 2010

Pella Corporation ranks highest in customer satisfaction

Pella Corporation has earned the prestigious J.D. Power and Associates award for “Highest in Customer Satisfaction among Window and Patio Door Manufacturers” for the third year in a row.

| Aug 11, 2010

Pella introduces BIM models for windows and doors

Pella Corporation now offers three-dimensional (3D) window and door models for use in Building Information Modeling (BIM) projects by architects, designers, and others looking for aesthetically correct, easy-to-use, data-rich 3D drawings.

| Aug 11, 2010

AAMA developing product-based green certification program for fenestration

The American Architectural Manufacturers Association is working on a product-based green certification program for residential and commercial fenestration, the organization announced today. AAMA will use the results of a recent green building survey to help shape the program. Among the survey's findings: 77% of respondents reported a green certification program for fenestration would benefit the product selection process for their company.

| Aug 11, 2010

AIA Course: Enclosure strategies for better buildings

Sustainability and energy efficiency depend not only on the overall design but also on the building's enclosure system. Whether it's via better air-infiltration control, thermal insulation, and moisture control, or more advanced strategies such as active façades with automated shading and venting or novel enclosure types such as double walls, Building Teams are delivering more efficient, better performing, and healthier building enclosures.

| Aug 11, 2010

World's tallest all-wood residential structure opens in London

At nine stories, the Stadthaus apartment complex in East London is the world’s tallest residential structure constructed entirely in timber and one of the tallest all-wood buildings on the planet. The tower’s structural system consists of cross-laminated timber (CLT) panels pieced together to form load-bearing walls and floors. Even the elevator and stair shafts are constructed of prefabricated CLT.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021