flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Three-building development to rise on vacant parcel in Chicago suburb Arlington Heights

Mixed-Use

Three-building development to rise on vacant parcel in Chicago suburb Arlington Heights

Tinaglia Architects designed the project.


By David Malone, Associate Editor | July 24, 2019
Arlington 425 aerial

All renderings courtesy Village of Arlington Heights/ Tinaglia Architects.

A $150 million, three-building mixed-use development is set to rise on a vacant parcel of land in Arlington Heights, a Chicago suburb about 30 miles northwest of the city. The Village Board recently approved the project, which will be the Village’s largest new development for Downtown in two decades.

Dubbed Arlington 425, the project includes a four-story, 54-unit residential building; a nine-story, 182-unit apartment building with the bottom two floors set aside for commercial space; and a 13-story, 125-unit apartment building that will include a six-story parking garage. The development will have a total of 361 units and over 44,000 sf of commercial space.

 

Rendering of Arlington 425 street level

 

An affordable housing plan was also agreed to that includes 18 affordable units (5% of the 361) for those at or below 60% of the area median income. The affordable units would be spread across two of the three buildings and include studio and one-bedroom floor plans.

The project will increase the parcel’s property taxes from about $40,000 a year to $1.5 to $2 million per year. Construction is not expected to begin until next spring at the earliest.

 

See Also: Shanghai’s T20 stacks office and community space atop a plant-filled parking garage

 

Tinaglia Architects designed the project. CCH LLC is the developer.

 

Arlington 425 highland building

Tags

Related Stories

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 3, 2011

Hardin Construction tops out Orlando Embassy Suites

The project began in April 2011 and is expected to open in fall 2012.

| Sep 30, 2011

Kilbourn joins Perkins Eastman

Kilbourn joins with more than 28 years of design and planning experience for communities, buildings, and interiors in hospitality, retail/mixed-use, corporate office, and healthcare.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021