flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Three-tiered, 57-story high-rise development from Arquitectonica coming to Miami

High-rise Construction

Three-tiered, 57-story high-rise development from Arquitectonica coming to Miami

The structure will be the tallest building in the Edgewater District


By David Malone, Associate Editor | July 12, 2016

Photo Courtesy or Arquitectonica via Arch Daily

With a Modernist appearance resembling the Olympic torch thanks to a three-tiered exterior structure and a floor plan that grows larger the higher up one goes, Elysee Residences is set to become the tallest structure in the Miami district of Edgewater.

The newly released design comes from the project’s architect, Arquitectonica, Arch Daily reports. Additionally, Jean-Louis Deniot and Two Roads Development are also part of the Building Team.

The structure’s three tiers are meant to divide the building into three vertical neighborhoods (which may be a bit of a disconcerting idea for anyone who read the 1975 British novel High-Rise or saw the recent movie adaptation) and will consist of 100 half- and full-floor luxury condominiums that include between three and five bedrooms. Each unit will have direct water views.

Construction is planned to begin at 700 NE 23rd St in Miami in the next few months with a target completion date in 2018.

Related Stories

High-rise Construction | Jun 5, 2015

Japanese policymakers discuss mandate for toilets in elevators

This quirky-sounding building code is a safety measure for the earthquake-prone nation.

Wood | Jun 2, 2015

Michael Green Architecture designs world's tallest wood building for Paris competition

“Just as Gustave Eiffel shattered our conception of what was possible a century and a half ago, this project can push the envelope of wood innovation with France in the forefront," said architect Michael Green of the project.  

High-rise Construction | May 6, 2015

Two new designs submitted for New York City Riverside Center

Both designs reference the cantilevers and other elements featured in architect Christian de Portzamparc’s original masterplan for the complex, which has now been scrapped.

High-rise Construction | May 6, 2015

Parks in the sky? Subterranean bike paths? Meet the livable city, designed in 3D

Today’s great cities must be resilient—and open—to many things, including the influx of humanity, writes Gensler co-CEO Andy Cohen. 

Building Owners | May 6, 2015

Hackathons and RFCs: Why one developer killed the RFP

In lieu of an RFP process, Skanska Commercial Development hosted a three-week "hackathon" to find an architect for its 2&U tower in Seattle.

High-rise Construction | Apr 30, 2015

World Trade Center developer looks to Bjarke Ingels for new tower design

Norman Foster’s design for 2 World Trade Center may be ousted, as developers are currently negotiating with Danish firm BIG to redesign the original scheme.

Hotel Facilities | Apr 29, 2015

OMA unveils design for the Netherlands' largest hotel

Once completed, and if approved, the structure will add three stacked cubes to the Amsterdam skyline.

Multifamily Housing | Apr 28, 2015

Mace and Make work on London's 40-story residential tower

The tower is one of six residential high-rises planned near London’s City Road, which is undergoing a mini construction boom.

High-rise Construction | Apr 23, 2015

Size matters in NYC, where several projects vie for the city’s tallest building honor

The latest renderings of 217 West 57th Street show a tower that would rise higher than the World Trade Center’s pinnacle, when elevations are included.

High-rise Construction | Apr 22, 2015

Architects propose sustainable ‘vertical city’ in the Sahara

Designers aim to make the 1,476-foot tower sustainable, relying on rainwater collection, solar power, and geothermal energy.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021