thyssenkrupp recently opened its newest plant in Zhongshan City, Guangdong Province, China. The focal point of the new facility is an 813-foot tower (31 floors above ground) that will be used to test new concepts and product pilots.
The tower includes 13 shafts and an Active Mass Damper (AMD) system meant to significantly reduce the extent of tower swing caused by changes in weather conditions. The AMD system can also mimic motions of extreme meteorological conditions, like earthquakes and typhoons.
A new high-speed elevator capable of reaching 40 miles per hour and MULTI, the world’s first rope-less elevator system, will be among the first technologies tested in the new tower. MULTI uses the power of linear motor technology to move multiple cars in a single shaft both vertically and horizontally with a much smaller footprint, substantial weight and mass reduction, and increased capacity.
The test tower is thyssenkrupp’s second. The first was completed in Germany, where the company is headquartered, last October.
Courtesy thyssenkrupp.
Related Stories
| Nov 5, 2012
Brasfield & Gorrie awarded new steel processing facility for Kloeckner Metals
The construction will take place on a 16-acre greenfield site at ThyssenKrupp Industrial Park in Calvert.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| Apr 25, 2012
Bubble skyscraper design aims to purify drinking water
The Freshwater Skyscraper will address the issue of increasing water scarcity through a process known as transpiration
| Dec 19, 2011
Survey: Job growth driving demand for office and industrial real estate in Southern California
Annual USC Lusk Center for Real Estate forecast reveals signs of slow market recovery.
| Nov 22, 2011
Saskatchewan's $1.24 billion carbon-capture project
The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.
| Oct 3, 2011
Balance bunker and Phase III projects breaks ground at Mitsubishi Plant in Georgia
The facility, a modification of similar facilities used by Mitsubishi Heavy Industries, Inc. (MHI) in Japan, was designed by a joint design team of engineers and architects from The Austin Company of Cleveland, Ohio, MPSA and MHI.