flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Timber high-rise residential complex will tower over Stockholm waterfront

High-rise Construction

Timber high-rise residential complex will tower over Stockholm waterfront

The four towers, 20 stories each, will be made entirely out of Swedish pine, from frame to façade.


By BD+C Staff | March 24, 2015
Timber residential high-rise will tower over Stockholm waterfront

The development will overlook an old harbor in Stockholm's industrial district on the island of Djurgården. Renderings courtesy Tham & Videgård Arkitekter

Swedish practice Tham & Videgård Arkitekter has released designs for high-rise residential blocks made out of timber that will tower over an unused transport harbor in Stockholm, Dezeen reports.

The firms say that the four 20-story apartment blocks, totalling 24,700 sm, will be made entirely out of Swedish pine, from frame to façade. 

A three-story base will connect the towers, providing 240 new homes, waterfront restaurants, cafes, and indoor gardens. 

The firm was commissioned by local developer Folkhem, which specializes in the construction of solid timber buildings. The apartment complex is part of a wider rejuvenation project for the industrial area.

"Through consistent use of a renewable material like wood, the result is a sustainable, well-insulated and robust house structure with good potential to perform well over time, and minimize the total energy consumption," the architects told Dezeen.

Dezeen has the full report.

 

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021